12115 Park Thirty Five Cir
Austin, TX 78753
12115 Park Thirty Five Cir: 2 projects on record
City of Austin lists 2 filings across 2 projects at 12115 Park Thirty Five Cir, Austin, TX 78753 since March 2, 2007. The most recent, filed May 11, 2007, covers: “Parkway building b”.
Compiled from City of Austin records · updated May 11, 2007
- Projects
- 2
- 2 filings
- Latest filing
- May 11, 2007
- since Mar 2, 2007
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 12115 Park Thirty Five Cir
What is being built at 12115 Park Thirty Five Cir?
The latest filing (City of Austin case 273562, May 11, 2007) covers parkway building b.
How many permits and filings does 12115 Park Thirty Five Cir have?
2 filings across 2 projects, from March 2, 2007 to May 11, 2007.
Is there other construction near 12115 Park Thirty Five Cir?
Yes. Nearby filings include 12124 Park Thirty Five Cir (install new n3r gear tie into existing underground feeders building c building c scope: remove existing switchgear located inside the building and replace with n3r gear. replace ct cans and meter enclosures, Jun 20, 2024); 12100 Park Thirty Five Cir (state property-etj install new n3r and pad mount transformer building a scope: remove existing switchgear located inside the building and replace with n3r gear. replace ct cans and meter enclosures. this is a totalized service the metering is totalized in aes billing system under the plain address. unit a, Jun 14, 2024); 12048 Park Thirty Five Cir (parkway building b remote parking - withdrawn, Mar 2, 2007).
How do I get alerts for new permits at 12115 Park Thirty Five Cir?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 12124 Park Thirty Five CirJun 20, 2024Install new n3r gear tie into existing underground feeders building c building c scope: remove existing switchgear located inside the building and replace with n3r gear. replace ct cans and meter enclosures · 160 m away
- 12100 Park Thirty Five CirJun 14, 2024State property-etj install new n3r and pad mount transformer building a scope: remove existing switchgear located inside the building and replace with n3r gear. replace ct cans and meter enclosures. this is a totalized service the metering is totalized in aes billing system under the plain address. unit a · 178 m away
- 12048 Park Thirty Five CirMar 2, 2007Parkway building b remote parking - withdrawn · 217 m away
- 12015 Park Thirty Five CirSep 3, 2026Replacement of any self-contained packaged units scope of work is to replace a quatity of three like for like 100 tons each self contained package units. no ductwork · 227 m away
- 12118 Walnut Park XingMay 29, 2025Repair main disconnect do to fire ***emergency inspection done on 5/22/25. no espa required-hyatt · 261 m away
- 12111-1/2 IH 35 SvrdAug 19, 2008Allen samuels subdivision · 300 m away
- 12121 IH 35 SvrdMar 9, 2026Dupius bowery 1 project assessment · 306 m away
- 12012 Park Thirty Five CirSep 3, 2026Replacement of an existing water heater · 355 m away
- 12151 IH 35 SvrdMar 2, 2007Windcrest/yager lane · 379 m away
- 12151 N IH 35 Svrd NbJan 22, 2024Replacement of condenser only unit 1136 · 379 m away
- 12021-1/2 IH 35 SvrdMar 9, 2026Dupius bowery 2 project assessment · 410 m away
- 12220 Walnut Park XingJul 19, 2009Limestone canyon ii · 412 m away