12220 Walnut Park Xing
Austin, TX 78753
12220 Walnut Park Xing: 2 projects on record
City of Austin lists 2 filings across 2 projects at 12220 Walnut Park Xing, Austin, TX 78753 since June 30, 2008. The most recent, filed July 19, 2009, covers: “Limestone canyon ii”.
Compiled from City of Austin records · updated Jul 19, 2009
- Projects
- 2
- 2 filings
- Latest filing
- Jul 19, 2009
- since Jun 30, 2008
- Largest scope
- —
- Listed value
- —
Permit & project history
2 projectsSources: City of Austin
Questions about 12220 Walnut Park Xing
What is being built at 12220 Walnut Park Xing?
The latest filing (City of Austin case 10174198, July 19, 2009) covers limestone canyon ii.
How many permits and filings does 12220 Walnut Park Xing have?
2 filings across 2 projects, from June 30, 2008 to July 19, 2009.
Is there other construction near 12220 Walnut Park Xing?
Yes. Nearby filings include 12101 N Lamar Blvd (replacement of furnace only replacement of 1.5 ton aquatherm with a new 1.5 ton aquatherm in unit 1412, Sep 2, 2025); 12101 Lamar Blvd (park 35 ii; lots 1-3, amended plat of lots, Sep 23, 2015); 12118 Walnut Park Xing (repair main disconnect do to fire ***emergency inspection done on 5/22/25. no espa required-hyatt, May 29, 2025).
How do I get alerts for new permits at 12220 Walnut Park Xing?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 12101 N Lamar BlvdSep 2, 2025Replacement of furnace only replacement of 1.5 ton aquatherm with a new 1.5 ton aquatherm in unit 1412 · 228 m away
- 12101 Lamar BlvdSep 23, 2015Park 35 ii; lots 1-3, amended plat of lots · 228 m away
- 12118 Walnut Park XingMay 29, 2025Repair main disconnect do to fire ***emergency inspection done on 5/22/25. no espa required-hyatt · 238 m away
- 12100 Park Thirty Five CirJun 14, 2024State property-etj install new n3r and pad mount transformer building a scope: remove existing switchgear located inside the building and replace with n3r gear. replace ct cans and meter enclosures. this is a totalized service the metering is totalized in aes billing system under the plain address. unit a · 246 m away
- 12516 Walnut Park XingJan 21, 2022Walnut park office · 294 m away
- 12115 Park Thirty Five CirMay 11, 2007Parkway building b · 412 m away
- 12124 Park Thirty Five CirJun 20, 2024Install new n3r gear tie into existing underground feeders building c building c scope: remove existing switchgear located inside the building and replace with n3r gear. replace ct cans and meter enclosures · 420 m away
- 12205 N Lamar BlvdSep 8, 2026Replacement of complete existing central heat and air system with or without duct work · 420 m away
- 12138 Lamar BlvdMar 2, 2007Walnut creek park addition cip #867883 · 444 m away
- 12138 N Lamar BlvdJan 26, 2024At 12138 n. lamar walnut creek metro park install city of austin provided musco sport lighting for existing basketball court. the electrical circuits for lights and control will be fed from the existing 120/208 lighting panel. underground conduit will be installed using underground boring · 444 m away
- 12030 Lamar BlvdDec 23, 2014La palma plaza(withdrawal & resubmit of sp-2012-0353c) · 467 m away
- 12007 N Lamar BlvdOct 30, 2026Replacement of complete existing central heat and air system with or without duct work · 467 m away