13212 N Lamar Blvd, Austin, TX 78753
Austin, TX 78753 · John B, Connally High School
Connally High School restroom and gym renovations
Renovations are planned at Connally High School at 13212 N Lamar Blvd in Austin. The TDLR project registration, filed March 6, 2025, describes remodeling 16 restrooms and making improvements to the competition gym, auxiliary gym, weight room, and north corridor. The applicant's estimated project cost is $2,319,620.
Summarized from Texas Department of Licensing and Regulation records · updated Mar 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Mar 6, 2025
- since Mar 6, 2025
- Largest scope
- 10,000 sf
- Estimated cost
- $2.3M
- state registration
Where this project stands
Finishing up · inspection nextConnally High School Renovations
10,000 sq ft · $2.3M est.
- RegisteredMar 6, 2025
- Plan review
- ConstructionJun '25 – Aug '25
- Inspectednow
- Closed
Scheduled to finish Aug 16, 2025; the state inspection hasn't been filed yet.
4 contacts on this project · 2 phone numbers
Permit & project history
1 projectRemodel 16 restrooms, new window openings in existing exterior walls of competition gym, axillary gym, and weight room. new rooftop skylights, lighting, and acoustical ceiling tiles at north corridor of competition gym. — john b, connally high school
TDLR project registrationRenovation/AlterationReview Complete10,000 sq ft$2.3M est.- Project #
- TABS2025013537
- Tenant / owner
- Connally High School Renovations
- Design firm
- Pro
- Contact
- Pro
Sources: Texas Department of Licensing and Regulation
Questions about 13212 N Lamar Blvd, Austin, TX 78753
What is being built at 13212 N Lamar Blvd in Austin?
A TDLR registration describes renovations at Connally High School, including work on 16 restrooms, gyms, the weight room, and a corridor. The project was filed March 6, 2025, under registration TABS2025013537.
What renovations are planned at Connally High School?
The registration describes remodeling 16 restrooms, adding window openings in existing exterior walls of the competition gym, auxiliary gym, and weight room, and adding rooftop skylights, lighting, and acoustical ceiling tiles along the north corridor of the competition gym.
When was the Connally High School renovation filed?
The TDLR project registration was filed March 6, 2025. Its listed status is Review Complete.
How much will the Connally High School renovations cost?
The applicant estimated the project cost at $2,319,620. This is an estimate for the project, not a reported final cost.
What's being renovated near Raising Cane's on North Lamar in Austin?
A TDLR registration describes renovations at Connally High School, 13212 N Lamar Blvd, about 349 meters from the listed Raising Cane's location. The registration was filed March 6, 2025.
Also being built nearby
All of 78753- 13212 N Lamar BlvdSep 18, 2026Remodel of restrooms on the first and second levels; new window openings in the existing exterior walls at weight room; new roof top skylights lighting and acoustical tiles at corridor north of competition gym · 35 m away
- 13212 Lamar BlvdOct 1, 2009Connally high school bandhall and science additions · 35 m away
- 13200 IH 35 SvrdNov 21, 2019Denny's · 214 m away
- 13000 IH 35 SvrdJul 27, 2016Panera bread #4460 · 225 m away
- 13216 IH 35 SvrdJul 8, 2025Hyperfuel ev infrastructure · 231 m away
- 13015-1/2 Lamar BlvdSep 17, 2026Tx18c14-s wm 3569 connally · 300 m away
- 13002-1/2 IH 35 SvrdApr 16, 2020Const s plan for utilities to lt 1b, blk a, resub of lt 1, five oaks parks north · 328 m away
- 12901 North Interstate Highway 35 Service Road · Raising Cane's Restaurant, L.l.c.Jul 29, 2025Raising cane's restaurant #1164 austin — new construction — ground up construction of a quick serve restaurant with attached corral, outdoor seating area, drive thru lanes with drive thru canopy · 349 m away
- 12901 N Interstate Highway 35 · Rd Management LLCFeb 15, 2024Five below - tech ridge — renovation/alteration — tenant improvement · 349 m away
- 1412 Tamar LnAug 3, 2026Replacement of complete existing central heat and air system with or without duct work **luis portillo: replace existing 3-ton horizontal gas hvac system with like-for-like equipment; no structural change · 349 m away
- 13109 Tamar CtNov 7, 2025New install · 356 m away
- 13105 Tamar CtSep 5, 2025Install additional 8.74 kw dc rooftop solar system to existing residential with existing 12.95 kw dc solar · 366 m away