301 White Oak Dr
Austin, TX 78753
301 White Oak Dr: 2 projects on record
City of Austin lists 2 filings across 2 projects at 301 White Oak Dr, Austin, TX 78753 since November 14, 2023. The most recent, filed November 15, 2023, covers: “Dig up and replace approximately 15 of sewer yard line from cleanout at house out to back yard only”.
Compiled from City of Austin records · updated Nov 15, 2023
- Projects
- 2
- 2 filings
- Latest filing
- Nov 15, 2023
- since Nov 14, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledDig up and replace approximately 15 of sewer yard line from cleanout at house out to back yard only
- AppliedNov 13, 2023
- IssuedNov 15, 2023
- WorkNov '23 – May '24
- Final inspectionMay 1, 2024
Passed final inspection May 1, 2024.
1 contact on this project · 1 phone number
Permit & project history
2 projectsDig up and replace approximately 15 of sewer yard line from cleanout at house out to back yard only
Dig up and replace approximately 15 of sewer yard line from cleanout at house out to back yard only
City of Austin permitPlumbing PermitFinal- Record
- 2023-146892 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
New in ground pool
New in ground pool
City of Austin permitElectrical PermitFinal- Record
- 2023-132842 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 301 White Oak Dr
What is being built at 301 White Oak Dr?
The latest filing (City of Austin permit 2023-146892 PP, November 15, 2023) covers dig up and replace approximately 15 of sewer yard line from cleanout at house out to back yard only.
How many permits and filings does 301 White Oak Dr have?
2 filings across 2 projects, from November 14, 2023 to November 15, 2023.
Is there other construction near 301 White Oak Dr?
Yes. Nearby filings include 206 E Powell Ln (close in garage and build master bedroom and bath. includes kitchen pantry closet and laundry room, Dec 29, 2023); 306 White Oak Dr (expose and repair waste piping below slab with a tunnel. plumbing contractor hired by homeowner states work is not related to the foundation repair applied for under 2023 146186 bp. they saw no other work occurring on site, Feb 7, 2024); 201 White Oak Dr (200amp oh service build, May 12, 2025).
How do I get alerts for new permits at 301 White Oak Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 206 E Powell LnDec 29, 2023Close in garage and build master bedroom and bath. includes kitchen pantry closet and laundry room · 51 m away
- 306 White Oak DrFeb 7, 2024Expose and repair waste piping below slab with a tunnel. plumbing contractor hired by homeowner states work is not related to the foundation repair applied for under 2023 146186 bp. they saw no other work occurring on site · 86 m away
- 201 White Oak DrMay 12, 2025200amp oh service build · 106 m away
- 205 Red Oak CirApr 23, 2026Replacement of complete existing central heat and air system with or without duct work · 113 m away
- 202 Red Oak CirJul 8, 2026Building #2: new 2-story dwelling unit 4 bed/3 bath with covered porch · 164 m away
- 208 Red Oak CirJan 21, 2024Tunnel under foundation to repipe full bathroom kitchen and washer line. replace sewer line from home to city tap · 166 m away
- 107 Red Oak CirJun 2, 2026Replace water heater · 166 m away
- 200 Red Oak CirAug 2, 2026Express: tub to shower conversion · 174 m away
- 105 Red Oak CirSep 14, 2026Express- replace 1 existing window with a new window of the same size; like for like install · 185 m away
- 301 E Lola DrSep 9, 2024Express - replace tub / shower with acrylic shower base and walls replace valves and fixtures · 186 m away
- 305 E Lola DrJan 14, 2025Excavate 15 tunnel to repair drain line serving bathroom *** per agent: we will be digging a 10 ft tunnel where the access hole is we are going to be digging on an angle and following the main line. we will be replacing all of the plumbing under the bathroom which includes tub toilet and sink. there is also a break in the main line that we will be replacing approximately 5 feet of 4 inch pipe. tunneling from the back left side of the house · 187 m away
- 106 E Lola DrAug 15, 2025Remodel retroactive garage conversion and retroactive covered deck · 190 m away
More pools in 78753.