groundranger
Historic · latest filing Sep 2024Residential

301 E Lola Dr

Austin, TX 78753

301 E Lola Dr: 2 projects on record

City of Austin lists 2 filings across 2 projects at 301 E Lola Dr, Austin, TX 78753. The most recent, filed September 9, 2024, covers: “Express - replace tub / shower with acrylic shower base and walls replace valves and fixtures”.

Compiled from City of Austin records · updated Sep 9, 2024

Projects
2
2 filings
Latest filing
Sep 9, 2024
since Sep 9, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Express - replace tub / shower with acrylic shower base and walls replace valves and fixtures

  1. AppliedSep 9, 2024
  2. IssuedSep 9, 2024
  3. WorkSep '24 – Jan '25
  4. Final inspectionJan 29, 2025

Passed final inspection Jan 29, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Express - replace tub / shower with acrylic shower base and walls replace valves and fixtures

    Express - replace tub / shower with acrylic shower base and walls replace valves and fixtures

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express - replace tub / shower with acrylic shower base and walls replace valves and fixtures

    Express - replace tub / shower with acrylic shower base and walls replace valves and fixtures

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 301 E Lola Dr

What is being built at 301 E Lola Dr?

The latest filing (City of Austin permit 2024-121995 PP, September 9, 2024) covers express - replace tub / shower with acrylic shower base and walls replace valves and fixtures.

How many permits and filings does 301 E Lola Dr have?

2 filings across 2 projects, from September 9, 2024 to September 9, 2024.

Is there other construction near 301 E Lola Dr?

Yes. Nearby filings include 305 E Lola Dr (excavate 15 tunnel to repair drain line serving bathroom *** per agent: we will be digging a 10 ft tunnel where the access hole is we are going to be digging on an angle and following the main line. we will be replacing all of the plumbing under the bathroom which includes tub toilet and sink. there is also a break in the main line that we will be replacing approximately 5 feet of 4 inch pipe. tunneling from the back left side of the house, Jan 14, 2025); 206 E Wonsley Dr (new construction single family residential 2-story 4 bedroom 2.5 bath with attached 1-car garage and covered front porch, Apr 7, 2026); 304 E Wonsley Dr (replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas, Feb 11, 2025).

How do I get alerts for new permits at 301 E Lola Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78753
Email me when a new permit is filed