groundranger
Historic · latest filing Feb 2025Residential

304 E Wonsley Dr

Austin, TX 78753

304 E Wonsley Dr: 1 project on record

City of Austin lists 1 filing across 1 project at 304 E Wonsley Dr, Austin, TX 78753. The most recent, filed February 11, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas”.

Compiled from City of Austin records · updated Feb 11, 2025

Projects
1
1 filings
Latest filing
Feb 11, 2025
since Feb 11, 2025
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas

  1. AppliedFeb 3, 2025
  2. IssuedFeb 11, 2025
  3. WorkFeb '25 – Feb '25
  4. Final inspectionFeb 25, 2025

Passed final inspection Feb 25, 2025.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. Replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas

    Replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 304 E Wonsley Dr

What is being built at 304 E Wonsley Dr?

The latest filing (City of Austin permit 2025-013406 MP, February 11, 2025) covers replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas.

How many permits and filings does 304 E Wonsley Dr have?

1 filing across 1 project, from February 11, 2025 to February 11, 2025.

Is there other construction near 304 E Wonsley Dr?

Yes. Nearby filings include 305 E Lola Dr (excavate 15 tunnel to repair drain line serving bathroom *** per agent: we will be digging a 10 ft tunnel where the access hole is we are going to be digging on an angle and following the main line. we will be replacing all of the plumbing under the bathroom which includes tub toilet and sink. there is also a break in the main line that we will be replacing approximately 5 feet of 4 inch pipe. tunneling from the back left side of the house, Jan 14, 2025); 301 E Lola Dr (express - replace tub / shower with acrylic shower base and walls replace valves and fixtures, Sep 9, 2024); 309 E Lola Dr (express: sheetrock repair in ceiling and some walls replace of hvac replace light switch lights and outlet covers replacement of all windows, Feb 4, 2026).

How do I get alerts for new permits at 304 E Wonsley Dr?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78753
Email me when a new permit is filed