8028 Gessner Dr
Austin, TX 78753
8028 Gessner Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 8028 Gessner Dr, Austin, TX 78753. The most recent, filed October 28, 2010, covers: “Chase village iii”.
Compiled from City of Austin records · updated Oct 28, 2010
- Projects
- 1
- 1 filings
- Latest filing
- Oct 28, 2010
- since Oct 28, 2010
- Largest scope
- —
- Listed value
- —
Permit & project history
1 projectSources: City of Austin
Questions about 8028 Gessner Dr
What is being built at 8028 Gessner Dr?
The latest filing (City of Austin case 208986, October 28, 2010) covers chase village iii.
How many permits and filings does 8028 Gessner Dr have?
1 filing across 1 project, from October 28, 2010 to October 28, 2010.
Is there other construction near 8028 Gessner Dr?
Yes. Nearby filings include 304 E Wonsley Dr (replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas, Feb 11, 2025); 206 E Wonsley Dr (new construction single family residential 2-story 4 bedroom 2.5 bath with attached 1-car garage and covered front porch, Apr 7, 2026); 214 Anderson Ln Svrd (214 c.u.p, Feb 24, 2011).
How do I get alerts for new permits at 8028 Gessner Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 304 E Wonsley DrFeb 11, 2025Replacement of complete existing central heat and air system with or without duct work 2.5 ton vertical gas · 122 m away
- 206 E Wonsley DrApr 7, 2026New construction single family residential 2-story 4 bedroom 2.5 bath with attached 1-car garage and covered front porch · 142 m away
- 214 Anderson Ln SvrdFeb 24, 2011214 c.u.p · 167 m away
- 305 E Lola DrJan 14, 2025Excavate 15 tunnel to repair drain line serving bathroom *** per agent: we will be digging a 10 ft tunnel where the access hole is we are going to be digging on an angle and following the main line. we will be replacing all of the plumbing under the bathroom which includes tub toilet and sink. there is also a break in the main line that we will be replacing approximately 5 feet of 4 inch pipe. tunneling from the back left side of the house · 169 m away
- 309 E Lola DrFeb 4, 2026Express: sheetrock repair in ceiling and some walls replace of hvac replace light switch lights and outlet covers replacement of all windows · 175 m away
- 301 E Lola DrSep 9, 2024Express - replace tub / shower with acrylic shower base and walls replace valves and fixtures · 175 m away
- 8005 Georgian DrOct 28, 2010The georgian apts · 193 m away
- 408 E Wonsley DrJul 3, 2025Emergency replacement of panel & meter socket for unit#102 · 193 m away
- 400 E Anderson Ln Svrd WbOct 22, 2025Installing conduit and wire from existing panels to gate motor controls · 193 m away
- 507 E Wonsley DrDec 5, 2025Install 2 portable stalls and sink outside building in the rear and connect outdoor sinks. will install pump with basin with 3 discharge pvc for existing church · 194 m away
- 414 Wonsley DrJul 15, 2020414 e wonsley drive · 198 m away
- 414 E Wonsley DrJun 11, 2025Reinstall meter to bld 1 apartment 1101 · 198 m away