403 Cooper Dr
Austin, TX 78753
403 Cooper Dr: 3 projects on record
City of Austin lists 3 filings across 3 projects at 403 Cooper Dr, Austin, TX 78753 since August 29, 2024. The most recent, filed September 4, 2024, covers: “Express: upgrade main electrical panel replace sub panel siding repair hvac replacement”.
Compiled from City of Austin records · updated Sep 4, 2024
- Projects
- 3
- 3 filings
- Latest filing
- Sep 4, 2024
- since Aug 29, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: upgrade main electrical panel replace sub panel siding repair hvac replacement
- AppliedAug 29, 2024
- IssuedSep 4, 2024
- WorkSep '24 – Sep '24
- Final inspectionSep 11, 2024
Passed final inspection Sep 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
3 projectsExpress: upgrade main electrical panel replace sub panel siding repair hvac replacement
Express: upgrade main electrical panel replace sub panel siding repair hvac replacement
City of Austin permitMechanical PermitFinal- Record
- 2024-111056 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: upgrade main electrical panel replace sub panel siding repair hvac replacement
Express: upgrade main electrical panel replace sub panel siding repair hvac replacement
City of Austin permitElectrical PermitFinal- Record
- 2024-111056 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: upgrade main electrical panel replace sub panel siding repair hvac replacement
Express: upgrade main electrical panel replace sub panel siding repair hvac replacement
City of Austin permitBuilding PermitFinal- Record
- 2024-111056 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 403 Cooper Dr
What is being built at 403 Cooper Dr?
The latest filing (City of Austin permit 2024-111056 MP, September 4, 2024) covers express: upgrade main electrical panel replace sub panel siding repair hvac replacement.
How many permits and filings does 403 Cooper Dr have?
3 filings across 3 projects, from August 29, 2024 to September 4, 2024.
What is being built near Austin ISD in Austin?
403 Cooper Dr is about 151 m from Austin ISD (9300 Slayton Drive). Its latest filing is for express: upgrade main electrical panel replace sub panel siding repair hvac replacement.
Is there other construction near 403 Cooper Dr?
Yes. Nearby filings include 203 Cooper Dr (sewer yard line replacement and tunneling under house, Jan 3, 2025); 9104 Slayton Dr (replacement of complete existing central heat and air system with or without duct work edward brown, Apr 8, 2025); 400 Cooper Dr (barrington elementary school, Aug 19, 2009).
How do I get alerts for new permits at 403 Cooper Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78753- 203 Cooper DrJan 3, 2025Sewer yard line replacement and tunneling under house · 39 m away
- 9104 Slayton DrApr 8, 2025Replacement of complete existing central heat and air system with or without duct work edward brown · 72 m away
- 400 Cooper DrAug 19, 2009Barrington elementary school · 82 m away
- 401 Gordon CtOct 13, 2026Work scope tunneling about 45ft and excavation of the plumbing replacement of cast iron to pvc putting the system on test and then confirming all plumbing has a water tight seal at every connection. back fill will not be performed until the city has signed off on the work and approved that all work is up to code · 90 m away
- 9013 Glenn LnMay 11, 2026Requesting shut off of meter. installing whole home generator installation with transfer switch · 111 m away
- 9201 Slayton DrMar 17, 2025Express: fire damage in one of the rooms due to wires overheating those cables are needed to be replaced as well as the main and sub electrical panel new insulation and sheetrock is needed to be installed for the walls and roof of this room its approx 400 ft of sheetrock · 112 m away
- 9107 Slayton DrAug 9, 2026Express- tub to shower conversion. replace 6 windows like for like · 112 m away
- 9107 Shepard DrOct 30, 2025Replacement of complete existing central heat and air system with or without duct work · 125 m away
- 9016 Slayton DrOct 27, 2026Replacement of complete existing central heat and air system with or without duct work · 127 m away
- 9103 Slayton DrMay 1, 2025Sewer line repair · 129 m away
- 9009 Glenn LnDec 8, 2025Interior remodel single-family residence. remodel living room space. a showerr added to the 1/2 bath. a bedroom to be removed to make living room open. new hvac renew plumbing water system to be renewed. bathroom and kitchen renovations. renew electrical system. new windows moving 1 liviing room window · 141 m away
- 9209 Slayton DrDec 12, 2023New accessory structure consisting of a carport with studio above containing a full bathroom accessed by an exterior wood staircase · 150 m away