9013 Glenn Ln
Austin, TX 78753
Whole-home generator permitted at 9013 Glenn Ln
City of Austin permit records describe a whole-home generator installation with a transfer switch at 9013 Glenn Ln, filed May 11, 2026. A plumbing permit filed February 18, 2026, covers a gas line for an 18-kilowatt generator; an electrical service upgrade was filed April 28, 2025.
Summarized from City of Austin records · updated May 11, 2026
- Projects
- 3
- 3 filings
- Latest filing
- May 11, 2026
- since Apr 28, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRequesting shut off of meter. installing whole home generator installation with transfer switch
- AppliedFeb 11, 2026
- IssuedMay 11, 2026
- WorkMay '26 – May '26
- Final inspectionMay 19, 2026
Passed final inspection May 19, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsRequesting shut off of meter. installing whole home generator installation with transfer switch
Requesting shut off of meter. installing whole home generator installation with transfer switch
City of Austin permitElectrical PermitFinal- Record
- 2026-016493 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Gas line to a 18kw generator roughly 20ft
Gas line to a 18kw generator roughly 20ft
City of Austin permitPlumbing PermitFinal- Record
- 2026-017681 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Service up existing service to a new 200a 120/240 over head service
Service up existing service to a new 200a 120/240 over head service
City of Austin permitElectrical PermitFinal- Record
- 2025-049056 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9013 Glenn Ln
What is being installed at 9013 Glenn Ln?
A City of Austin electrical permit describes a whole-home generator installation with a transfer switch. It was filed May 11, 2026, under permit 2026-016493 EP.
Is a generator being installed at 9013 Glenn Ln in Austin?
Yes. The May 11, 2026, electrical permit describes a whole-home generator installation with a transfer switch.
What size generator is planned for 9013 Glenn Ln?
A plumbing permit filed February 18, 2026, describes a gas line for an 18-kilowatt generator. The electrical permit describes it as a whole-home generator.
When were the permits filed for work at 9013 Glenn Ln?
The City of Austin records list filings on April 28, 2025, February 18, 2026, and May 11, 2026.
Was the electrical service upgraded at 9013 Glenn Ln?
A permit filed April 28, 2025, describes upgrading the existing service to a new 200-amp, 120/240 overhead service. The permit number is 2025-049056 EP.
What does permit 2026-017681 PP cover at 9013 Glenn Ln?
The City of Austin plumbing permit, filed February 18, 2026, describes a gas line to an 18-kilowatt generator, roughly 20 feet long.
Also being built nearby
All of 78753- 9009 Glenn LnDec 8, 2025Interior remodel single-family residence. remodel living room space. a showerr added to the 1/2 bath. a bedroom to be removed to make living room open. new hvac renew plumbing water system to be renewed. bathroom and kitchen renovations. renew electrical system. new windows moving 1 liviing room window · 47 m away
- 401 Gordon CtOct 13, 2026Work scope tunneling about 45ft and excavation of the plumbing replacement of cast iron to pvc putting the system on test and then confirming all plumbing has a water tight seal at every connection. back fill will not be performed until the city has signed off on the work and approved that all work is up to code · 63 m away
- 9016 Slayton DrOct 27, 2026Replacement of complete existing central heat and air system with or without duct work · 102 m away
- 9012 Slayton DrDec 11, 2025Excavate 20 tunnel to repair main drain line under house excavate 35 trench to repair main drain line under yard · 107 m away
- 403 Cooper DrSep 4, 2024Express: upgrade main electrical panel replace sub panel siding repair hvac replacement · 111 m away
- 9104 Slayton DrApr 8, 2025Replacement of complete existing central heat and air system with or without duct work edward brown · 126 m away
- 203 Cooper DrJan 3, 2025Sewer yard line replacement and tunneling under house · 127 m away
- 9006 Slayton DrNov 14, 2025Replacement of furnace only · 136 m away
- 9107 Shepard DrOct 30, 2025Replacement of complete existing central heat and air system with or without duct work · 147 m away
- 505 Grissom CtNov 15, 2023Excavate 40 tunnel to repair drain line · 149 m away
- 9013 Slayton DrAug 6, 2026Replace sewer line in the yard · 152 m away
- 9103 Slayton DrMay 1, 2025Sewer line repair · 154 m away