11017 Long Winter Dr
Austin, TX 78754
11017 Long Winter Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 11017 Long Winter Dr, Austin, TX 78754. The most recent, filed August 7, 2024, covers: “Express: foundation repair”.
Compiled from City of Austin records · updated Aug 7, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Aug 7, 2024
- since Aug 7, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress: foundation repair
- AppliedAug 6, 2024
- IssuedAug 7, 2024
- WorkAug '24 – Aug '24
- Final inspectionAug 15, 2024
Passed final inspection Aug 15, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: foundation repair
Express: foundation repair
City of Austin permitBuilding PermitFinal- Record
- 2024-099180 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11017 Long Winter Dr
What is being built at 11017 Long Winter Dr?
The latest filing (City of Austin permit 2024-099180 BP, August 7, 2024) covers express: foundation repair.
How many permits and filings does 11017 Long Winter Dr have?
1 filing across 1 project, from August 7, 2024 to August 7, 2024.
Is there other construction near 11017 Long Winter Dr?
Yes. Nearby filings include 11008 Long Winter Dr (replacement of 3.5 ton horizontal evaporator coil only on existing 3.5 ton horizontal split gas system. drain pan p-trap safety switches & bi-flow filter drier transition between b cabinet furnace & coil. per mc agent all components of hvac, Mar 17, 2025); 11000 Long Winter Dr (pioneer crossing west sec 6 — pioneer crossing west section 6, Feb 5, 2009); 11115 Wet Season Dr (replacement of an existing water heater 40 gallon natural gas water heater change out, Sep 23, 2025).
How do I get alerts for new permits at 11017 Long Winter Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78754- 11008 Long Winter DrMar 17, 2025Replacement of 3.5 ton horizontal evaporator coil only on existing 3.5 ton horizontal split gas system. drain pan p-trap safety switches & bi-flow filter drier transition between b cabinet furnace & coil. per mc agent all components of hvac · 65 m away
- 11000 Long Winter DrFeb 5, 2009Pioneer crossing west sec 6 — pioneer crossing west section 6 · 91 m away
- 11115 Wet Season DrSep 23, 2025Replacement of an existing water heater 40 gallon natural gas water heater change out · 95 m away
- 11133 Friendship DrJul 11, 2025(zelada daniel) - installation of circuit for elec. vehicle charging station - esip · 113 m away
- 11121 Wet Season DrJul 18, 2024Replacement of an existing water heater · 115 m away
- 11120 Wet Season DrFeb 15, 2024Express: foundation repair on a slab foundation. we intend to install 19 total press pilings piers including 16 perimeter and 3 interior locations. there will be 6 breakthrough patches. we improve level to the extent · 129 m away
- 11212 Friendship DrJul 2, 2024Replacement of complete existing central heat and air system with or without duct work · 131 m away
- 11200 Long Winter DrDec 1, 2023Replacement of an existing water heater : 40 gal gas wh · 136 m away
- 2109 Tin Can DrDec 11, 2024Installation of an ev charging system for a 2024 f-150 · 137 m away
- 11216 Friendship DrJan 7, 2026After hours emergency repairs / replacement of residential meter base · 150 m away
- 2113 Tin Can DrJun 10, 2026Replacing existing water yard line with a new water line. 2 access holes for trenchless repair · 151 m away
- 2108 Buffalo Tundra DrAug 3, 2025Replacement of complete existing central heat and air system with or without duct work · 155 m away