2113 Tin Can Dr
Austin, TX 78754
Water line replacement permitted at 2113 Tin Can Dr
A new water line is being installed to replace the existing water yard line at 2113 Tin Can Dr. The City of Austin issued plumbing permit 2026-072507 PP on June 10, 2026, for the work, which includes two access holes for trenchless repair.
Summarized from City of Austin records · updated Jun 10, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jun 10, 2026
- since Jun 10, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacing existing water yard line with a new water line. 2 access holes for trenchless repair
- AppliedJun 8, 2026
- IssuedJun 10, 2026
- WorkJun '26 – Jun '26
- Final inspectionJun 16, 2026
Passed final inspection Jun 16, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacing existing water yard line with a new water line. 2 access holes for trenchless repair
Replacing existing water yard line with a new water line. 2 access holes for trenchless repair
City of Austin permitPlumbing PermitFinal- Record
- 2026-072507 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2113 Tin Can Dr
What is happening at 2113 Tin Can Dr?
A City of Austin permit covers replacing the existing water yard line with a new water line. The work includes two access holes for trenchless repair.
Is a new building being built at 2113 Tin Can Dr?
The filing is for water line replacement, not a new building. It is a plumbing permit dated June 10, 2026.
When was the water line work permitted at 2113 Tin Can Dr?
The City of Austin issued permit 2026-072507 PP on June 10, 2026.
What does the permit at 2113 Tin Can Dr cover?
It covers replacing the existing water yard line with a new water line and creating two access holes for trenchless repair.
What is the status of permit 2026-072507 PP?
The City of Austin permit record lists its status as Final.
Also being built nearby
All of 78754- 2109 Tin Can DrDec 11, 2024Installation of an ev charging system for a 2024 f-150 · 15 m away
- 2108 Buffalo Tundra DrAug 3, 2025Replacement of complete existing central heat and air system with or without duct work · 43 m away
- 2124 Tin Can DrDec 2, 2024We plan to install a 11.070kw solar array on the homeowners residential roof · 65 m away
- 2113 Buffalo Tundra DrOct 29, 2026Replacement of an existing water heater replace ng water heater · 93 m away
- 11133 Friendship DrJul 11, 2025(zelada daniel) - installation of circuit for elec. vehicle charging station - esip · 98 m away
- 2212 Buffalo Tundra DrJan 5, 2024Replacement of complete existing central heat and air system with or without duct work · 100 m away
- 11017 Long Winter DrAug 7, 2024Express: foundation repair · 151 m away
- 2128 Nestlewood DrMay 7, 2025Express: tub/shower replacement · 168 m away
- 2120 Nestlewood DrJul 16, 2026Replacement of complete existing central heat and air system with or without duct work replacement of hvac system · 169 m away
- 12420 Timber Heights DrMar 2, 2007Pioneer crossing west sec 8b — pioneer crossing west sec 8b · 174 m away
- 12624 Timber Heights DrNov 17, 2025Install new 5.7kw rooftop solar system to existing residential only using line side tap · 183 m away
- 11212 Friendship DrJul 2, 2024Replacement of complete existing central heat and air system with or without duct work · 185 m away