11105 Harvest Time Dr
Austin, TX 78754
Foundation and sewer repairs at 11105 Harvest Time Dr
Austin permits record foundation repairs and a subfloor sanitary sewer repair at 11105 Harvest Time Dr. The foundation permit was filed May 11, 2026, and the sewer repair permit was filed July 21, 2026.
Summarized from City of Austin records · updated Jul 21, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jul 21, 2026
- since May 11, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRepair of subfloor sanitary sewer under cement slab on grade foundation via tunnel excavation
- AppliedJul 8, 2026
- IssuedJul 21, 2026
- WorkJul '26 – Aug '26
- Final inspectionAug 5, 2026
Passed final inspection Aug 5, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsRepair of subfloor sanitary sewer under cement slab on grade foundation via tunnel excavation
Repair of subfloor sanitary sewer under cement slab on grade foundation via tunnel excavation
City of Austin permitPlumbing PermitFinal- Record
- 2026-087501 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair - installing steel piers
Express: foundation repair - installing steel piers
City of Austin permitBuilding PermitFinal- Record
- 2026-058589 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11105 Harvest Time Dr
What is being built at 11105 Harvest Time Dr?
The Austin permits describe home repairs, not new construction: foundation work installing steel piers and a sanitary sewer repair beneath the slab.
What repairs are planned at 11105 Harvest Time Dr in Austin?
Permit 2026-058589 BP describes foundation repair using steel piers. Permit 2026-087501 PP describes repairing the subfloor sanitary sewer through tunnel excavation.
When were permits filed for 11105 Harvest Time Dr?
The foundation permit was filed May 11, 2026. The sewer repair permit was filed July 21, 2026.
Is a new house being built at 11105 Harvest Time Dr?
The records provided describe foundation and sewer repairs, not a new house.
What is permit 2026-087501 PP for in Austin?
Permit 2026-087501 PP, filed July 21, 2026, is for repairing a sanitary sewer beneath the slab using tunnel excavation.
Also being built nearby
All of 78754- 11108 Silo Valley DrFeb 19, 2026Excavation of two tunnels to identify and rectify defects in the drainage system. the first tunnel will be constructed from the front yard following the cleanout and will extend 5 feet beneath the house to expose a break in the wye off the main drainage line. the second tunnel will be excavated from the left side of the house extending 5 feet to expose the bend in the hall toilet · 43 m away
- 11117 Harvest Time DrSep 25, 2026Excavate 40 to repair break in the yard line · 57 m away
- 11108 Harvest Time DrJun 18, 2026Express: foundation repair - installing steel piers · 58 m away
- 11112 Harvest Time DrFeb 10, 2025Express: replace windows as needed · 71 m away
- 3309 Harvest Time CvNov 7, 2025Express: foundation repair · 82 m away
- 11101 Liberty Farms DrMay 23, 2025Replacement of an existing water heater 11101 liberty farms drive austin tx 78754 usa · 126 m away
- 11129 Liberty Farms DrSep 21, 2026Install level 2 ev charger · 128 m away
- 11016 Furrow Hill DrApr 28, 2025Replacement of complete existing central heat and air system with or without duct work hvac changeout - replace old system with new 4 ton single stage trane system · 133 m away
- 11201 Liberty Farms DrJan 13, 2026Express: install 12 push piers · 136 m away
- 3304 Harvest Time CvJun 30, 2026Replacement of complete existing central heat and air system with or without duct work patricia hospie: replace 4-ton like-for-like electric system · 137 m away
- 11012 Furrow Hill DrFeb 26, 2024Replacement of complete existing central heat and air system with or without duct work · 137 m away
- 11025 Silo Valley DrSep 22, 2025Replacement of complete existing central heat and air system with or without duct work · 143 m away