Yard-line repair permitted at 11117 Harvest Time Dr
A plumbing permit covers excavation to repair a break in the yard line at 11117 Harvest Time Dr. The City of Austin issued the active permit on September 25, 2026; it does not describe a new building.
Summarized from City of Austin records · updated Sep 25, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Sep 25, 2026
- since Sep 25, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayExcavate 40 to repair break in the yard line
- AppliedSep 21, 2026
- IssuedSep 25, 2026
- WorkSep '26 – Mar '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
1 projectExcavate 40 to repair break in the yard line
Excavate 40 to repair break in the yard line
City of Austin permitPlumbing PermitActive- Record
- 2026-124184 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11117 Harvest Time Dr
What work is permitted at 11117 Harvest Time Dr?
A City of Austin plumbing permit describes excavation to repair a break in the yard line.
When was the plumbing permit issued?
The permit was filed on September 25, 2026, and is listed as active.
What is the permit number for 11117 Harvest Time Dr?
The permit number is 2026-124184 PP.
Is a new home being built at 11117 Harvest Time Dr?
The record describes a yard-line repair, not construction of a new home.
Is the work at 11117 Harvest Time Dr a plumbing project?
Yes. The City of Austin record lists it as a plumbing permit for excavation and yard-line repair.
Also being built nearby
All of 78754- 3309 Harvest Time CvNov 7, 2025Express: foundation repair · 47 m away
- 11105 Harvest Time DrJul 21, 2026Repair of subfloor sanitary sewer under cement slab on grade foundation via tunnel excavation · 57 m away
- 11112 Harvest Time DrFeb 10, 2025Express: replace windows as needed · 62 m away
- 11108 Silo Valley DrFeb 19, 2026Excavation of two tunnels to identify and rectify defects in the drainage system. the first tunnel will be constructed from the front yard following the cleanout and will extend 5 feet beneath the house to expose a break in the wye off the main drainage line. the second tunnel will be excavated from the left side of the house extending 5 feet to expose the bend in the hall toilet · 67 m away
- 11108 Harvest Time DrJun 18, 2026Express: foundation repair - installing steel piers · 69 m away
- 3304 Harvest Time CvJun 30, 2026Replacement of complete existing central heat and air system with or without duct work patricia hospie: replace 4-ton like-for-like electric system · 86 m away
- 11125 Silo Valley DrOct 6, 2025Express: foundation repair · 114 m away
- 11200 Silo Valley DrJun 19, 2026Replacement of furnace only · 123 m away
- 11129 Liberty Farms DrSep 21, 2026Install level 2 ev charger · 130 m away
- 11201 Liberty Farms DrJan 13, 2026Express: install 12 push piers · 130 m away
- 11205 Liberty Farms DrNov 10, 2026Express: foundation repair on a slab foundation. we intend to install 14 total press piling piers including 12 perimeter and 2 interior locations. there will be 7 breakthrough and patched locations. we will improve level · 134 m away
- 11204 Silo Valley DrApr 10, 2024Not pre-plumbed water softener install · 140 m away