11536 Church Canyon Dr
Austin, TX 78754
Foundation repair permitted at 11536 Church Canyon Dr
A City of Austin permit indicates foundation repair at 11536 Church Canyon Dr, with 16 exterior and 7 interior pilings to be installed. Permit 2026-064731 BP was filed on May 21, 2026, and is listed as final.
Summarized from City of Austin records · updated May 21, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 21, 2026
- since May 21, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExpress- foundation repair. install 16 exterior and 7 interior pilings
- AppliedMay 21, 2026
- IssuedMay 21, 2026
- WorkMay '26 – Jun '26
- Final inspectionJun 18, 2026
Passed final inspection Jun 18, 2026.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress- foundation repair. install 16 exterior and 7 interior pilings
Express- foundation repair. install 16 exterior and 7 interior pilings
City of Austin permitBuilding PermitFinal- Record
- 2026-064731 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11536 Church Canyon Dr
What is being built at 11536 Church Canyon Dr?
A City of Austin permit indicates foundation repair, including installation of 16 exterior and 7 interior pilings. The permit does not describe a new building.
When was the foundation repair permitted at 11536 Church Canyon Dr?
Permit 2026-064731 BP was filed on May 21, 2026.
What does permit 2026-064731 BP cover?
The City of Austin permit covers foundation repair and installation of 16 exterior and 7 interior pilings. It is listed as final.
Is 11536 Church Canyon Dr a new construction project?
The permit describes foundation repair, not new construction. It lists installation of exterior and interior pilings.
How many pilings are included in the Church Canyon Dr permit?
The permit lists 23 pilings: 16 exterior and 7 interior. It was filed May 21, 2026, as City of Austin permit 2026-064731 BP.
Also being built nearby
All of 78754- 11524 Church Canyon DrMar 3, 2026Excavation of a 20-foot tunnel to reveal breaks in the drainage line. the excavation will expose a break near the cleanout an additional break on the main drainage line and a break on the upstairs drop-down · 37 m away
- 11537 Church Canyon DrOct 26, 2026Disconnect/reconnect to upgrade main distribution panel & meter · 47 m away
- 11520 Church Canyon DrMay 8, 2026Gas off for an extended amount of time gas company required city inspection and gas test · 50 m away
- 11516 Church Canyon DrJan 8, 2026Excavate 7 tunnel to repair main drain line under house · 62 m away
- 11521 Church Canyon DrMar 6, 2025Express: foundation repair - install 7 piers · 64 m away
- 11513 Church Canyon DrMar 17, 2026Express: foundation repair · 84 m away
- 11508 Church Canyon DrFeb 8, 2026Access by tunnel to repair failed drain piping · 89 m away
- 11509 Church Canyon DrApr 4, 2025Emergency main panel replacement no meter can · 97 m away
- 11504 Church Canyon DrOct 28, 2025Excavte 15 trench to repair main drain line in yard · 100 m away
- 11505 Church Canyon DrAug 6, 2026Express: foundation repair · 109 m away
- 11502-1/2 Samsung BlvdOct 28, 2017Pioneer crossing east section 4b · 113 m away
- 11501 Church Canyon DrSep 28, 2026Tunnel to repair broken pipe under foundation · 122 m away