11713 Rydalwater Ln
Austin, TX 78754
Electrical panel and drain-line work permitted on Rydalwater Ln
City of Austin records show a permit to replace about 26 feet of drain line at 11713 Rydalwater Ln, filed March 24, 2026. A second permit, filed April 2, 2026, covers replacing the electrical meter and main panel.
Summarized from City of Austin records · updated Apr 2, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Apr 2, 2026
- since Mar 24, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledThe electric provider is bluebonnet but the adress is in austins full purpose jurisdiction. will be replacing electrical meter and main panel
- AppliedMar 30, 2026
- IssuedApr 2, 2026
- WorkApr '26 – Jun '26
- Final inspectionJun 3, 2026
Passed final inspection Jun 3, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsThe electric provider is bluebonnet but the adress is in austins full purpose jurisdiction. will be replacing electrical meter and main panel
The electric provider is bluebonnet but the adress is in austins full purpose jurisdiction. will be replacing electrical meter and main panel
City of Austin permitElectrical PermitFinal- Record
- 2026-038210 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace damaged pipe section approximately 26 feet of drain line
Replace damaged pipe section approximately 26 feet of drain line
City of Austin permitPlumbing PermitFinal- Record
- 2026-034577 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11713 Rydalwater Ln
What work is happening at 11713 Rydalwater Ln?
City of Austin permits indicate about 26 feet of drain line will be replaced and the electrical meter and main panel will be replaced. The plumbing permit was filed March 24, 2026, and the electrical permit was filed April 2, 2026.
Is a new building being built at 11713 Rydalwater Ln?
The records provided describe plumbing and electrical replacements, not a new building. They list a drain-line repair and replacement of the electrical meter and main panel.
When was the drain-line permit filed at 11713 Rydalwater Ln?
The City of Austin filed plumbing permit 2026-034577 PP on March 24, 2026. It covers replacing about 26 feet of drain line.
What does electrical permit 2026-038210 EP cover?
The permit, filed April 2, 2026, covers replacing the electrical meter and main panel at 11713 Rydalwater Ln. The record notes that the property is in Austin's full-purpose jurisdiction.
Are the permits for 11713 Rydalwater Ln final?
Both City of Austin permit records have a status of Final. They cover plumbing work under permit 2026-034577 PP and electrical work under permit 2026-038210 EP.
Also being built nearby
All of 78754- 11711 Rydalwater LnSep 26, 2025Tunnel under foundation to expose and replace all exposed sewer line under slab until we reach the broken line under the kitchen. tunnel access will be located at homeowner cleanout on side of garage · 27 m away
- 11705 Rydalwater LnJun 6, 2025Main water service 30 · 98 m away
- 11723 Rydalwater LnJun 19, 2024115 tunnel below the foundation to repair entire cast-iron drain system. 1 front 1 right side 1 back access holes · 101 m away
- 11628 Loweswater LnSep 2, 2026Replacement of condenser only · 107 m away
- 6302 Gidleigh CtJul 24, 2026Replacement of complete existing central heat and air system with or without duct work · 108 m away
- 11706 Rydalwater LnSep 2, 2025Replacement of complete existing central heat and air system with or without duct work · 108 m away
- 6301 Gidleigh CtSep 9, 2026Express: foundation repair revision 1: add plumbing permit · 115 m away
- 11824 Dunfries LnMar 13, 202550ft sewer line repair · 115 m away
- 11804 Dunfries LnAug 10, 2026Existing foundation repair as per scope of work attached drawing · 124 m away
- 11701 Rydalwater LnMay 13, 2024Install evse · 126 m away
- 11704 Rydalwater LnOct 16, 2024Tunnel to repair drainage system *** we are repairing 3 breaks under the master bathroom 2 on the mainline for the master bathroom about 20 feet from the outside wall on the master bathroom and one break that is near the outside wall. all breaks should be under the master bathroom or relatively close. the initial plan is to perform spot repairs · 129 m away
- 11624 Loweswater LnAug 6, 202528 tunnel starting in front yard to expose building drain to hall bathroom toilet 90 thats broken. we will be replacing 25 of pipe from cleanout to 90 · 134 m away