11705 Rydalwater Ln
Austin, TX 78754
11705 Rydalwater Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 11705 Rydalwater Ln, Austin, TX 78754. The most recent, filed June 6, 2025, covers: “Main water service 30”.
Compiled from City of Austin records · updated Jun 6, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 6, 2025
- since Jun 6, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledMain water service 30
- AppliedMay 29, 2025
- IssuedJun 6, 2025
- WorkJun '25 – Jun '25
- Final inspectionJun 20, 2025
Passed final inspection Jun 20, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectMain water service 30
Main water service 30
City of Austin permitPlumbing PermitFinal- Record
- 2025-066674 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11705 Rydalwater Ln
What is being built at 11705 Rydalwater Ln?
The latest filing (City of Austin permit 2025-066674 PP, June 6, 2025) covers main water service 30.
How many permits and filings does 11705 Rydalwater Ln have?
1 filing across 1 project, from June 6, 2025 to June 6, 2025.
Is there other construction near 11705 Rydalwater Ln?
Yes. Nearby filings include 11701 Rydalwater Ln (install evse, May 13, 2024); 11706 Rydalwater Ln (replacement of complete existing central heat and air system with or without duct work, Sep 2, 2025); 11704 Rydalwater Ln (tunnel to repair drainage system *** we are repairing 3 breaks under the master bathroom 2 on the mainline for the master bathroom about 20 feet from the outside wall on the master bathroom and one break that is near the outside wall. all breaks should be under the master bathroom or relatively close. the initial plan is to perform spot repairs, Oct 16, 2024).
How do I get alerts for new permits at 11705 Rydalwater Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78754- 11701 Rydalwater LnMay 13, 2024Install evse · 33 m away
- 11706 Rydalwater LnSep 2, 2025Replacement of complete existing central heat and air system with or without duct work · 39 m away
- 11704 Rydalwater LnOct 16, 2024Tunnel to repair drainage system *** we are repairing 3 breaks under the master bathroom 2 on the mainline for the master bathroom about 20 feet from the outside wall on the master bathroom and one break that is near the outside wall. all breaks should be under the master bathroom or relatively close. the initial plan is to perform spot repairs · 42 m away
- 11700 Rydalwater LnOct 31, 2025Replacement of an existing water heater installing like/like g water heater · 55 m away
- 11711 Rydalwater LnSep 26, 2025Tunnel under foundation to expose and replace all exposed sewer line under slab until we reach the broken line under the kitchen. tunnel access will be located at homeowner cleanout on side of garage · 72 m away
- 11628 Loweswater LnSep 2, 2026Replacement of condenser only · 82 m away
- 11804 Dunfries LnAug 10, 2026Existing foundation repair as per scope of work attached drawing · 98 m away
- 11713 Rydalwater LnApr 2, 2026The electric provider is bluebonnet but the adress is in austins full purpose jurisdiction. will be replacing electrical meter and main panel · 98 m away
- 11624 Loweswater LnAug 6, 202528 tunnel starting in front yard to expose building drain to hall bathroom toilet 90 thats broken. we will be replacing 25 of pipe from cleanout to 90 · 112 m away
- 11619 Loweswater LnDec 19, 2025Replacement of an existing water heater replace 65-gal hybrid electric water heater location: garage · 124 m away
- 11624 Rydalwater LnJun 17, 2024Replacement of an existing water heater · 126 m away
- 11610 Winterborne CtApr 29, 2024Excavate 20 tunnel to repair main line under the house-no branches will be dug · 145 m away