11908 Arran St
Austin, TX 78754
11908 Arran St: 1 project on record
City of Austin lists 1 filing across 1 project at 11908 Arran St, Austin, TX 78754. The most recent, filed June 4, 2024, covers: “Install level 2 ev charger”.
Compiled from City of Austin records · updated Jun 4, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 4, 2024
- since Jun 4, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedJun 4, 2024
- IssuedJun 4, 2024
- WorkJun '24 – Dec '24
- Final inspectionJun 19, 2024
Passed final inspection Jun 19, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2024-070119 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11908 Arran St
What is being built at 11908 Arran St?
The latest filing (City of Austin permit 2024-070119 EP, June 4, 2024) covers install level 2 ev charger.
How many permits and filings does 11908 Arran St have?
1 filing across 1 project, from June 4, 2024 to June 4, 2024.
Is there other construction near 11908 Arran St?
Yes. Nearby filings include 11900 Arran St (express: foundation repair - installing 27 exterior & 10 interior pilings, Jul 17, 2026); 11916 Arran St (express: foundation repair, May 13, 2024); 11828 Arran St (express: foundation repair - installing steel piers, Nov 12, 2026).
How do I get alerts for new permits at 11908 Arran St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78754- 11900 Arran StJul 17, 2026Express: foundation repair - installing 27 exterior & 10 interior pilings · 31 m away
- 11916 Arran StMay 13, 2024Express: foundation repair · 32 m away
- 11828 Arran StNov 12, 2026Express: foundation repair - installing steel piers · 48 m away
- 11909 Arran StFeb 21, 2024Express foundation repair · 61 m away
- 11905 Arran StOct 7, 2024Express: foundation repair · 65 m away
- 11917 Arran StNov 2, 2026Replacement of an existing water heater - remove existing water heater - inspect area where unit was located and assess for any signs of damage. - replace with builder-grade residential natural gas 50 gallon water heater. this will include replacing water heater supply lines · 67 m away
- 11820 Arran StJul 23, 2025Gas company required a gas test to have gas turned on after a long length of time it was disconnected · 77 m away
- 11929 Arran StJul 21, 2026Add 2 (120v 20amp gfci) circuits for handicap walk-in whirlpool tub being installed where regular tub was located · 96 m away
- 6012 Gaelic CtJul 6, 2026Express- foundation repair. install 18 total pilings · 137 m away
- 12016 Arran StOct 9, 2026Replacing the sewer line outside of the home from the cleanout to the city cleanout area · 150 m away
- 6017 Gaelic CtApr 27, 2026Express: foundation repair (install 16 press piling including 13 perimeter and 3 interior 7 breakthrough and patched locations improve level) · 154 m away
- 6302 Gidleigh CtJul 24, 2026Replacement of complete existing central heat and air system with or without duct work · 176 m away