11909 Arran St
Austin, TX 78754
11909 Arran St: 1 project on record
City of Austin lists 1 filing across 1 project at 11909 Arran St, Austin, TX 78754. The most recent, filed February 21, 2024, covers: “Express foundation repair”.
Compiled from City of Austin records · updated Feb 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 21, 2024
- since Feb 21, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredExpress foundation repair
- AppliedFeb 20, 2024
- IssuedFeb 21, 2024
- !WorkFeb '24 – Aug '24
- Final inspection
Marked expired Aug 20, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress foundation repair
Express foundation repair
City of Austin permitBuilding PermitExpired- Record
- 2024-021007 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 11909 Arran St
What is being built at 11909 Arran St?
The latest filing (City of Austin permit 2024-021007 BP, February 21, 2024) covers express foundation repair.
How many permits and filings does 11909 Arran St have?
1 filing across 1 project, from February 21, 2024 to February 21, 2024.
Is there other construction near 11909 Arran St?
Yes. Nearby filings include 11905 Arran St (express: foundation repair, Oct 7, 2024); 11917 Arran St (replacement of an existing water heater - remove existing water heater - inspect area where unit was located and assess for any signs of damage. - replace with builder-grade residential natural gas 50 gallon water heater. this will include replacing water heater supply lines, Nov 2, 2026); 11908 Arran St (install level 2 ev charger, Jun 4, 2024).
How do I get alerts for new permits at 11909 Arran St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78754- 11905 Arran StOct 7, 2024Express: foundation repair · 16 m away
- 11917 Arran StNov 2, 2026Replacement of an existing water heater - remove existing water heater - inspect area where unit was located and assess for any signs of damage. - replace with builder-grade residential natural gas 50 gallon water heater. this will include replacing water heater supply lines · 34 m away
- 11908 Arran StJun 4, 2024Install level 2 ev charger · 61 m away
- 11900 Arran StJul 17, 2026Express: foundation repair - installing 27 exterior & 10 interior pilings · 65 m away
- 11828 Arran StNov 12, 2026Express: foundation repair - installing steel piers · 71 m away
- 11916 Arran StMay 13, 2024Express: foundation repair · 72 m away
- 11929 Arran StJul 21, 2026Add 2 (120v 20amp gfci) circuits for handicap walk-in whirlpool tub being installed where regular tub was located · 81 m away
- 11820 Arran StJul 23, 2025Gas company required a gas test to have gas turned on after a long length of time it was disconnected · 91 m away
- 6302 Gidleigh CtJul 24, 2026Replacement of complete existing central heat and air system with or without duct work · 117 m away
- 6301 Gidleigh CtSep 9, 2026Express: foundation repair revision 1: add plumbing permit · 142 m away
- 12016 Arran StOct 9, 2026Replacing the sewer line outside of the home from the cleanout to the city cleanout area · 170 m away
- 6012 Gaelic CtJul 6, 2026Express- foundation repair. install 18 total pilings · 179 m away