Equipment addition and suite remodel at 2535 Ridgepoint Drive

TDLR registrations indicate equipment is being added in an existing area of this multi-tenant building at 2535 Ridgepoint Drive, with no changes to its layout, use, occupancy or egress. The Phase 3 registration was filed April 30, 2026; a separate interior remodel for Phase 2 was filed March 17, 2025.

Summarized from Texas Department of Licensing and Regulation records · updated Apr 30, 2026

Projects
3
3 filings
Latest filing
Apr 30, 2026
since Jun 27, 2024
Largest scope
29,627 sf
Estimated cost
$4.0M
state registration

Where this project stands

Finishing up · inspection next

EnergyX Phase 3

2,575 sq ft · $250K est.

  1. RegisteredApr 30, 2026
  2. Plan review
  3. ConstructionJun '26 – Sep '26
  4. Inspectednow
  5. Closed

Scheduled to finish Sep 1, 2026; the state inspection hasn't been filed yet.

4 contacts on this project · 4 phone numbers

Permit & project history

3 projects
  1. EnergyX Phase 3

    Addition of equipment in an existing area - no change to interior design elements (walls, doors, lighting, etc). no changes of use, occupancy, or egress. — promontory point

    TDLR project registrationRenovation/AlterationReview Complete2,575 sq ft$250K est.
    Tenant / owner
    Energyx Phase 3
    Design firm
    Pro
    Contact
    Pro
  2. EnergyX Phase 2

    Interior remodel of existing suite in a tilt wall structure - this scope of work is phase two of the completed phase 1 work in the remaining area of the building. — promontory point

    TDLR project registrationRenovation/AlterationInspection Complete5,854 sq ft$2.0M est.
    Tenant / owner
    Energyx Phase 2
    Design firm
    Pro
    Contact
    Pro
  3. EnergyX

    Interior remodel of existing suite in a tilt wall structure. — promontory point

    TDLR project registrationRenovation/AlterationProject Closed29,627 sq ft$4.0M est.
    Tenant / owner
    Pro
    Design firm
    Pro
    Contact
    Pro

Sources: Texas Department of Licensing and Regulation

Questions about 2535 Ridgepoint Drive

What is being built at 2535 Ridgepoint Drive?

TDLR records describe an equipment addition in an existing area of the multi-tenant building. The work does not change the interior design elements, use, occupancy or egress.

Is 2535 Ridgepoint Drive a new building?

The records describe work in an existing building, not construction of a new building. They include an equipment addition and an interior suite remodel.

When was the work at 2535 Ridgepoint Drive filed?

The Phase 3 registration, TABS2026019109, was filed April 30, 2026. The Phase 2 registration, TABS2025014413, was filed March 17, 2025.

What is EnergyX Phase 3 at 2535 Ridgepoint Drive?

It is a TDLR-registered renovation or alteration for adding equipment in an existing area. The registration lists 2,575 square feet and was filed April 30, 2026.

What is being built near TVMA on Exchange Drive?

At 2535 Ridgepoint Drive, about 510 meters from TVMA at 8104 Exchange Drive, TDLR records describe equipment being added to an existing area of a multi-tenant building.

Also being built nearby

All of 78754
Email me when it passes inspection