9010 Wellesley Dr
Austin, TX 78754
Drain-line repairs permitted at 9010 Wellesley Dr
A City of Austin plumbing permit indicates drain lines in the master bathroom, kitchen and laundry room at 9010 Wellesley Dr are being repaired by tunneling, with defective piping and fittings replaced with PVC. The permit was filed October 13, 2026, and is marked final.
Summarized from City of Austin records · updated Oct 13, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Oct 13, 2026
- since Oct 13, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledRepairing drain lines in the master bathroom kitchen and laundry room via tunneling. removing and replacing any defective sections of piping and fittings with pvc
- AppliedOct 13, 2026
- IssuedOct 13, 2026
- WorkOct '26 – Nov '26
- Final inspectionNov 12, 2026
Passed final inspection Nov 12, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectRepairing drain lines in the master bathroom kitchen and laundry room via tunneling. removing and replacing any defective sections of piping and fittings with pvc
Repairing drain lines in the master bathroom kitchen and laundry room via tunneling. removing and replacing any defective sections of piping and fittings with pvc
City of Austin permitPlumbing PermitFinal- Record
- 2026-134455 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 9010 Wellesley Dr
What is being built at 9010 Wellesley Dr?
The permit describes plumbing repairs, not a new building: drain lines in the master bathroom, kitchen and laundry room are being repaired by tunneling.
What work is permitted at 9010 Wellesley Dr in Austin?
The permit covers tunneling to repair drain lines and replacing defective piping and fittings with PVC.
When was the plumbing permit filed?
The City of Austin permit was filed October 13, 2026. Its status is listed as final.
What is the permit number for 9010 Wellesley Dr?
The permit number is 2026-134455 PP. It is a City of Austin plumbing permit filed October 13, 2026.
Is a restaurant opening at 9010 Wellesley Dr?
The listed permit describes residential drain-line repairs and does not indicate that a restaurant is opening.
Also being built nearby
All of 78754- 5219 Coppermead LnJan 24, 2024Excavate 24 for yardline repair · 108 m away
- 5206 Coppermead LnJul 30, 2025Replacement of an existing water heater 40gal gas · 123 m away
- 5200 Coppermead LnSep 21, 2026Main water line repair · 127 m away
- 5214 Coppermead LnJan 23, 2025Repair 2 kitchen drain line below slab access on side of house · 132 m away
- 8805 Merion CirApr 23, 2025Sewer spot repair · 175 m away
- 8803 Merion CirSep 17, 2026New irrigation install on all landscape areas · 194 m away
- 9200 Wellesley DrMay 8, 2026Subfloor sanitary sewer repair via tunnel excavation · 272 m away
- 9206 Wellesley DrOct 28, 2024Tunnel to be dug under home to fix broken main sewer line · 297 m away
- 9108 Magna Carta LoopSep 16, 2024Remove and replace 18 feet of sewer line · 301 m away
- 9201 Magna Carta LoopSep 17, 2025Excavate 20 trench to repair main drain line in yard · 352 m away
- 3638 Quiette DrJul 10, 2026Upgrade main service to 350 amps · 396 m away
- 3632 Quiette DrSep 30, 202560 tunnel below the foundation to replace entire drain system and 15 trench to repair yard sewer. 4 access holes-left back back right · 404 m away
More restaurants in 78754.