5219 Coppermead Ln
Austin, TX 78754
5219 Coppermead Ln: 1 project on record
City of Austin lists 1 filing across 1 project at 5219 Coppermead Ln, Austin, TX 78754. The most recent, filed January 24, 2024, covers: “Excavate 24 for yardline repair”.
Compiled from City of Austin records · updated Jan 24, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jan 24, 2024
- since Jan 24, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExcavate 24 for yardline repair
- AppliedJan 15, 2024
- IssuedJan 24, 2024
- WorkJan '24 – Jan '25
- Final inspectionJan 28, 2025
Passed final inspection Jan 28, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectExcavate 24 for yardline repair
Excavate 24 for yardline repair
City of Austin permitPlumbing PermitFinal- Record
- 2024-004941 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5219 Coppermead Ln
What is being built at 5219 Coppermead Ln?
The latest filing (City of Austin permit 2024-004941 PP, January 24, 2024) covers excavate 24 for yardline repair.
How many permits and filings does 5219 Coppermead Ln have?
1 filing across 1 project, from January 24, 2024 to January 24, 2024.
Is there other construction near 5219 Coppermead Ln?
Yes. Nearby filings include 5214 Coppermead Ln (repair 2 kitchen drain line below slab access on side of house, Jan 23, 2025); 5206 Coppermead Ln (replacement of an existing water heater 40gal gas, Jul 30, 2025); 9010 Wellesley Dr (repairing drain lines in the master bathroom kitchen and laundry room via tunneling. removing and replacing any defective sections of piping and fittings with pvc, Oct 13, 2026).
How do I get alerts for new permits at 5219 Coppermead Ln?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78754- 5214 Coppermead LnJan 23, 2025Repair 2 kitchen drain line below slab access on side of house · 57 m away
- 5206 Coppermead LnJul 30, 2025Replacement of an existing water heater 40gal gas · 98 m away
- 9010 Wellesley DrOct 13, 2026Repairing drain lines in the master bathroom kitchen and laundry room via tunneling. removing and replacing any defective sections of piping and fittings with pvc · 108 m away
- 5200 Coppermead LnSep 21, 2026Main water line repair · 136 m away
- 8805 Merion CirApr 23, 2025Sewer spot repair · 206 m away
- 8803 Merion CirSep 17, 2026New irrigation install on all landscape areas · 229 m away
- 9108 Magna Carta LoopSep 16, 2024Remove and replace 18 feet of sewer line · 277 m away
- 9200 Wellesley DrMay 8, 2026Subfloor sanitary sewer repair via tunnel excavation · 336 m away
- 9201 Magna Carta LoopSep 17, 2025Excavate 20 trench to repair main drain line in yard · 347 m away
- 9206 Wellesley DrOct 28, 2024Tunnel to be dug under home to fix broken main sewer line · 352 m away
- 4810 ValcourNov 6, 2024: install a new meter and expansion coupling for underground service. the foundation is shifting and causing the conduit to pull the meter off the wall. this will prevent the meter from coming off again and pulling the panel down as well · 391 m away
- 4811 Virginia Dare LnSep 4, 2025This project is an electrical service upgrade at 4811 virginia dare ln. the existing main service equipment has sustained heat damage with portions of the disconnect showing signs of burning. while the service entrance conductors from the utility to the meter are intact and will remain in place the equipment from the meter socket to the main panel requires replacement and upgrade to ensure safety and compliance with austin energy standards. the work includes replacing the existing main disconnect with a 150a rated device and installing a new 200a approved meter socket to replace the older existing meter enclosure. the meter base upgrade ensures compliance with austin energys current list of approved meter sockets. the existing service conductors between the meter and main panel will be re-terminated and inspected for condition and proper connections. no changes will be made to the utility-side service entrance conductors. all work will include proper grounding and bonding per nec and austin energy requirements. the installation will be performed with coordination for same-day disconnect/reconnect with austin energy to minimize service downtime for the homeowner. final inspection will be scheduled through the ab+c portal and the completed installation will provide a safe code-compliant service upgrade to replace older damaged equipment while maintaining the approved service configuration per the espa. service is underground · 435 m away