4312 Bellvue Ave
Austin, TX 78756
4312 Bellvue Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 4312 Bellvue Ave, Austin, TX 78756. The most recent, filed April 24, 2024, covers: “Replaced prv”.
Compiled from City of Austin records · updated Apr 24, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 24, 2024
- since Apr 24, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplaced prv
- AppliedApr 22, 2024
- IssuedApr 24, 2024
- WorkApr '24 – May '24
- Final inspectionMay 2, 2024
Passed final inspection May 2, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplaced prv
Replaced prv
City of Austin permitPlumbing PermitFinal- Record
- 2024-049942 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4312 Bellvue Ave
What is being built at 4312 Bellvue Ave?
The latest filing (City of Austin permit 2024-049942 PP, April 24, 2024) covers replaced prv.
How many permits and filings does 4312 Bellvue Ave have?
1 filing across 1 project, from April 24, 2024 to April 24, 2024.
Is there other construction near 4312 Bellvue Ave?
Yes. Nearby filings include 4311 Bellvue Ave (new construction accessory use in-ground pool, Oct 13, 2026); 4306 Bellvue Ave (replacement of complete existing central heat and air system with or without duct work 3 ton two stage vertical gas downstairs system, Dec 6, 2024); 4309 Bellvue Ave (construct new driveway approach of 10 ft. driveway approach is from the alley. no sidewalk inspection per plan review.*shay inspections to occur concurrently with second driveway permitted 21-128922 ds, Dec 19, 2023).
How do I get alerts for new permits at 4312 Bellvue Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78756- 4311 Bellvue AveOct 13, 2026New construction accessory use in-ground pool · 42 m away
- 4306 Bellvue AveDec 6, 2024Replacement of complete existing central heat and air system with or without duct work 3 ton two stage vertical gas downstairs system · 46 m away
- 4309 Bellvue AveDec 19, 2023Construct new driveway approach of 10 ft. driveway approach is from the alley. no sidewalk inspection per plan review.*shay inspections to occur concurrently with second driveway permitted 21-128922 ds · 50 m away
- 4304 Bellvue AveMar 25, 2025Express: replace 5 windows like for like · 61 m away
- 4305 Bellvue AveDec 18, 2024New irrigation system · 74 m away
- 4403 Bellvue AveNov 21, 2025Express- existing foundation repair as per scope of work attached · 74 m away
- 4307 Maybelle AveAug 15, 2024Replacement of complete existing central heat and air system with or without duct work · 79 m away
- 4411 Maybelle AveNov 11, 2026I am applying for a temporary meter loop for a single-family home that is getting built ref: 2026-119521 bp · 91 m away
- 4300 Bellvue AveJan 17, 2025Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 4310 Marathon BlvdSep 18, 2024Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 4308 Marathon BlvdJan 23, 2024Abandon leaking water line and reroute it in attic · 99 m away
- 4301 Bellvue AveJun 1, 2026New construction of 2-story secondary unit with 2 new driveways · 101 m away