4811 Shoal Creek Blvd
Austin, TX 78756
4811 Shoal Creek Blvd: 5 projects on record
City of Austin lists 5 filings across 5 projects at 4811 Shoal Creek Blvd, Austin, TX 78756 since September 9, 2024. The most recent, filed September 25, 2024, covers: “Nstall new main water feed from city meter to copper under home”.
Compiled from City of Austin records · updated Sep 25, 2024
- Projects
- 5
- 5 filings
- Latest filing
- Sep 25, 2024
- since Sep 9, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledNstall new main water feed from city meter to copper under home
- AppliedSep 19, 2024
- IssuedSep 25, 2024
- WorkSep '24 – Sep '24
- Final inspectionSep 30, 2024
Passed final inspection Sep 30, 2024.
1 contact on this project · 1 phone number
Permit & project history
5 projectsNstall new main water feed from city meter to copper under home
Nstall new main water feed from city meter to copper under home
City of Austin permitPlumbing PermitFinal- Record
- 2024-127394 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Ev charger
Ev charger
City of Austin permitElectrical PermitFinal- Record
- 2024-126535 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Plug for tankless install
Plug for tankless install
City of Austin permitElectrical PermitFinal- Record
- 2024-112715 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Tankless install
Tankless install
City of Austin permitPlumbing PermitFinal- Record
- 2024-112681 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-093531 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4811 Shoal Creek Blvd
What is being built at 4811 Shoal Creek Blvd?
The latest filing (City of Austin permit 2024-127394 PP, September 25, 2024) covers nstall new main water feed from city meter to copper under home.
How many permits and filings does 4811 Shoal Creek Blvd have?
5 filings across 5 projects, from September 9, 2024 to September 25, 2024.
Is there other construction near 4811 Shoal Creek Blvd?
Yes. Nearby filings include 4808 Shoal Creek Blvd (installing circuit for use with a plug-in ev charger, May 20, 2024); 4808 Woodview Ave (install sprinklers to turf and dripline to flowerbeds, May 8, 2026); 4708 Hilwin Cir (replacement of complete existing central heat and air system with or without duct work, Jul 2, 2026).
How do I get alerts for new permits at 4811 Shoal Creek Blvd?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78756- 4808 Shoal Creek BlvdMay 20, 2024Installing circuit for use with a plug-in ev charger · 59 m away
- 4808 Woodview AveMay 8, 2026Install sprinklers to turf and dripline to flowerbeds · 60 m away
- 4708 Hilwin CirJul 2, 2026Replacement of complete existing central heat and air system with or without duct work · 70 m away
- 4805 Woodview AveNov 27, 2023New in-ground pool (333 sq ft) and concrete deck (440 sq ft). 139 sq ft of flatwork to be removed · 99 m away
- 4807 Woodview AveJul 16, 2026Tunnel under home in order to replace cast iron with schedule 40 pvc up to bottom of foundation. approx 30ft · 103 m away
- 4815 Woodview AveJul 6, 2026Meter and panel change out grounding gas meter installing 2 ground rods and grounding the panel · 105 m away
- 4903 Shoal Creek BlvdSep 28, 2026Install level 2 ev charger · 106 m away
- 4803 Woodview AveJun 30, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 4 ton horizontal gas system · 106 m away
- 4801 Woodview AveNov 13, 2025Cap off water/wastewater total demolition of sfr 1257 sq ft circa 1946 · 117 m away
- 2306 W 49th StJul 28, 2026(stahl karlee) - installation of circuit for elec. vehicle charging station - esip · 118 m away
- 4707 Strass DrDec 18, 2024New pool and spa · 132 m away
- 4705 Hilwin CirJul 31, 2024Trench up to 35â from city water meter to house. install new water yard line with 1â� pex and new homeowner cut off valve with sleeve. connect new water yard line under house to existing water system and install new hose bib with vacuum breaker. backfill trench upon city inspection · 140 m away