4903 Shoal Creek Blvd
Austin, TX 78756
Level 2 EV charger permitted at 4903 Shoal Creek Blvd
A City of Austin permit indicates installation of a Level 2 EV charger at 4903 Shoal Creek Blvd. The electrical permit, 2026-125290 EP, was filed September 28, 2026, and its status is Final.
Summarized from City of Austin records · updated Sep 28, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Sep 28, 2026
- since Sep 28, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedSep 23, 2026
- IssuedSep 28, 2026
- WorkSep '26 – Mar '27
- Final inspectionOct 1, 2026
Passed final inspection Oct 1, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-125290 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-131230 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2023-061355 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4903 Shoal Creek Blvd
What is being installed at 4903 Shoal Creek Blvd?
A City of Austin electrical permit covers installation of a Level 2 EV charger at the address.
When was the EV charger permit filed at 4903 Shoal Creek Blvd?
The permit was filed September 28, 2026.
What type of EV charger is listed on the permit?
The permit description specifies a Level 2 EV charger.
Is there a permit for an EV charger at 4903 Shoal Creek Blvd?
Yes. City of Austin permit 2026-125290 EP covers installation of a Level 2 EV charger.
What is the status of the EV charger permit at 4903 Shoal Creek Blvd?
The City of Austin permit record lists its status as Final.
Also being built nearby
All of 78756- 4907 Shoal Creek BlvdAug 31, 2026Add bedroom &level portion of exist foundation · 46 m away
- 4908 Woodview AveOct 2, 2026Base: installing a backup battery system and additional meter socket · 82 m away
- 4910 Woodview AveJan 21, 2026Replacement of an existing water heater · 101 m away
- 4905 Woodview AveJun 23, 2025Replace existing water heater with tankless water heater · 103 m away
- 4811 Shoal Creek BlvdSep 25, 2024Nstall new main water feed from city meter to copper under home · 106 m away
- 2306 W 49th StJul 28, 2026(stahl karlee) - installation of circuit for elec. vehicle charging station - esip · 121 m away
- 5003 Shoal Creek BlvdFeb 27, 2024Detached accessory structure with bathroom · 128 m away
- 4916 Shoal Creek BlvdSep 9, 2024Replace about 100 of sanitary sewer yard line in the front yard · 129 m away
- 4815 Woodview AveJul 6, 2026Meter and panel change out grounding gas meter installing 2 ground rods and grounding the panel · 143 m away
- 4905 Strass DrJan 10, 2025Express: fire damage repair · 146 m away
- 4808 Shoal Creek BlvdMay 20, 2024Installing circuit for use with a plug-in ev charger · 147 m away
- 4907 Strass DrJul 1, 2026Install a full lawn sprinkler system · 149 m away