4905 Woodview Ave
Austin, TX 78756
4905 Woodview Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 4905 Woodview Ave, Austin, TX 78756. The most recent, filed June 23, 2025, covers: “Replace existing water heater with tankless water heater”.
Compiled from City of Austin records · updated Jun 23, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 23, 2025
- since Jun 23, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplace existing water heater with tankless water heater
- AppliedMar 13, 2025
- IssuedJun 23, 2025
- !WorkJun '25 – Dec '25
- Final inspection
Marked expired Dec 21, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplace existing water heater with tankless water heater
Replace existing water heater with tankless water heater
City of Austin permitPlumbing PermitExpired- Record
- 2025-030380 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 4905 Woodview Ave
What is being built at 4905 Woodview Ave?
The latest filing (City of Austin permit 2025-030380 PP, June 23, 2025) covers replace existing water heater with tankless water heater.
How many permits and filings does 4905 Woodview Ave have?
1 filing across 1 project, from June 23, 2025 to June 23, 2025.
Is there other construction near 4905 Woodview Ave?
Yes. Nearby filings include 4908 Woodview Ave (base: installing a backup battery system and additional meter socket, Oct 2, 2026); 5000 Shoalwood Ave (replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton vertical gas system, Sep 22, 2025); 4910 Woodview Ave (replacement of an existing water heater, Jan 21, 2026).
How do I get alerts for new permits at 4905 Woodview Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78756- 4908 Woodview AveOct 2, 2026Base: installing a backup battery system and additional meter socket · 49 m away
- 5000 Shoalwood AveSep 22, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 3.5 ton vertical gas system · 62 m away
- 4910 Woodview AveJan 21, 2026Replacement of an existing water heater · 63 m away
- 4907 Shoal Creek BlvdAug 31, 2026Add bedroom &level portion of exist foundation · 93 m away
- 2306 W 49th StJul 28, 2026(stahl karlee) - installation of circuit for elec. vehicle charging station - esip · 93 m away
- 4903 Shoal Creek BlvdSep 28, 2026Install level 2 ev charger · 103 m away
- 5001 Shoalwood AveFeb 3, 2025New pool (200 sq ft) and spa (36 sq ft) with required enclosure device · 105 m away
- 5005 Shoalwood AveNov 10, 2025Replacement of complete existing central heat and air system with or without duct work · 106 m away
- 5005 Woodview AveMar 4, 2024Installation of 3.95 kw solar pv system · 106 m away
- 5012 Shoalwood AveSep 3, 2025Cap off of total demolition of sfr 1064 sq ft circa1947 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 117 m away
- 5003 Shoal Creek BlvdFeb 27, 2024Detached accessory structure with bathroom · 121 m away
- 2225 Hancock DrDec 11, 2024This project is an interior and exterior renovation of an existing 1-story office building · 128 m away