5517 Joe Sayers Ave
Austin, TX 78756
5517 Joe Sayers Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 5517 Joe Sayers Ave, Austin, TX 78756. The most recent, filed October 21, 2024, covers: “Home energy savers with austin energy job with a/c and duct replacement”.
Compiled from City of Austin records · updated Oct 21, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 21, 2024
- since Oct 21, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledHome energy savers with austin energy job with a/c and duct replacement
- AppliedSep 30, 2024
- IssuedOct 21, 2024
- WorkOct '24 – Oct '24
- Final inspectionOct 22, 2024
Passed final inspection Oct 22, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectHome energy savers with austin energy job with a/c and duct replacement
Home energy savers with austin energy job with a/c and duct replacement
City of Austin permitMechanical PermitFinal- Record
- 2024-131906 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 5517 Joe Sayers Ave
What is being built at 5517 Joe Sayers Ave?
The latest filing (City of Austin permit 2024-131906 MP, October 21, 2024) covers home energy savers with austin energy job with a/c and duct replacement.
How many permits and filings does 5517 Joe Sayers Ave have?
1 filing across 1 project, from October 21, 2024 to October 21, 2024.
Is there other construction near 5517 Joe Sayers Ave?
Yes. Nearby filings include 5511 Joe Sayers Ave (tceq-compliant components: * 1 dca backflow preventer (in-ground): required by tceq to protect the public water supply from contamination. this device will be tested and registered with the city upon completion. * 1 isolation valve: also required by tceq this allows for emergency shutoff of the irrigation system without affecting the homes water supply. * two 1 master valves (one per controller): as per tceq code a master valve is required for each controller to help prevent line leaks or water loss when the system is off. irrigation zones: * four irrigreen rotor zones: these precision digital rotors map watering patterns for each turf zone reducing overspray and maximizing efficiency. * two drip irrigation zones: installed for landscape beds these zones use subsurface drip tubing with 12 emitter spacing to deliver water directly to plant roots. installation details: * trenching: all piping will be installed at 810 inches deep using trenchers or hand tools depending on site conditions. * controllers and wiring: system will include complete controller installation wiring and testing, Nov 4, 2025); 5602 Woodrow Ave (replacement of complete existing central heat and air system with or without duct work install replacement of 2 ton heat pump, Jun 3, 2026); 5518 Woodrow Ave (construct new driveway approach of 12 ft. no sidewalk inspection per plan review, Aug 14, 2025).
How do I get alerts for new permits at 5517 Joe Sayers Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78756- 5511 Joe Sayers AveNov 4, 2025Tceq-compliant components: * 1 dca backflow preventer (in-ground): required by tceq to protect the public water supply from contamination. this device will be tested and registered with the city upon completion. * 1 isolation valve: also required by tceq this allows for emergency shutoff of the irrigation system without affecting the homes water supply. * two 1 master valves (one per controller): as per tceq code a master valve is required for each controller to help prevent line leaks or water loss when the system is off. irrigation zones: * four irrigreen rotor zones: these precision digital rotors map watering patterns for each turf zone reducing overspray and maximizing efficiency. * two drip irrigation zones: installed for landscape beds these zones use subsurface drip tubing with 12 emitter spacing to deliver water directly to plant roots. installation details: * trenching: all piping will be installed at 810 inches deep using trenchers or hand tools depending on site conditions. * controllers and wiring: system will include complete controller installation wiring and testing · 56 m away
- 5602 Woodrow AveJun 3, 2026Replacement of complete existing central heat and air system with or without duct work install replacement of 2 ton heat pump · 81 m away
- 5518 Woodrow AveAug 14, 2025Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 93 m away
- 5516 Woodrow AveMay 24, 2024Replacement of an existing water heater · 94 m away
- 5604 Woodrow AveMar 3, 2025Replacement of an existing water heater 40gal electric tank · 94 m away
- 5505 Joe Sayers AveDec 18, 2025Express- removal of current composition shingle roof covering. re-roof with composition shingle and new underlayment · 96 m away
- 5601 Woodrow AveJan 2, 2026Replacement of an existing water heater change out: install/ replace 30 gallon electric tank-type water heater · 120 m away
- 5511 Jim Hogg AveJul 25, 2024Replacement of complete existing central heat and air system with or without duct work · 125 m away
- 5608 Joe Sayers AveFeb 21, 2024Replacement of complete existing central heat and air system with or without duct work · 126 m away
- 5502 Joe Sayers AveOct 1, 2024Replacing damaged overhead · 131 m away
- 5506 Woodrow AveSep 15, 2025Replacement of complete existing central heat and air system with or without duct work · 133 m away
- 5607 Jim Hogg AveNov 14, 2024Interior remodel to add shower to half bath; converting to full bath · 159 m away