1002 Payne Ave
Austin, TX 78757
1002 Payne Ave: 2 projects on record
City of Austin lists 2 filings across 2 projects at 1002 Payne Ave, Austin, TX 78757 since February 2, 2024. The most recent, filed April 17, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.
Compiled from City of Austin records · updated Apr 17, 2024
- Projects
- 2
- 2 filings
- Latest filing
- Apr 17, 2024
- since Feb 2, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredReplacement of complete existing central heat and air system with or without duct work
- AppliedApr 10, 2024
- IssuedApr 17, 2024
- !WorkApr '24 – Nov '25
- Final inspection
Marked expired Nov 15, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitExpired- Record
- 2024-044777 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Express: foundation repair (installing 2 exterior pilings and adjusting off existing peirs)
Express: foundation repair (installing 2 exterior pilings and adjusting off existing peirs)
City of Austin permitBuilding PermitFinal- Record
- 2024-013174 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1002 Payne Ave
What is being built at 1002 Payne Ave?
The latest filing (City of Austin permit 2024-044777 MP, April 17, 2024) covers replacement of complete existing central heat and air system with or without duct work.
How many permits and filings does 1002 Payne Ave have?
2 filings across 2 projects, from February 2, 2024 to April 17, 2024.
Is there other construction near 1002 Payne Ave?
Yes. Nearby filings include 1000 Payne Ave (construct new driveway approach of 12 ft. no sidewalk inspection per plan review, Sep 12, 2025); 908 Payne Ave (find and repair gas leak, Jun 3, 2024); 1007 Payne Ave (replace sewer line from home to city tap connection. total length of sewer line approximately 55 feet, Oct 14, 2026).
How do I get alerts for new permits at 1002 Payne Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1000 Payne AveSep 12, 2025Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 18 m away
- 908 Payne AveJun 3, 2024Find and repair gas leak · 36 m away
- 1007 Payne AveOct 14, 2026Replace sewer line from home to city tap connection. total length of sewer line approximately 55 feet · 52 m away
- 906 Payne AveSep 22, 2026Total demolition of sfr 1128 sq ft circa 1952 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 54 m away
- 907 Karen AveNov 16, 2026Installation of a 200a service-rated automatic transfer switch 26kw whole home generator additional grounding and type 2 surge protection · 68 m away
- 1009 Karen AveAug 6, 2025Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 79 m away
- 1010 Arcadia AveDec 4, 2023Replace existing water heater · 88 m away
- 1102 Payne AveNov 8, 2024Emergency : replace gas line to repair leak · 98 m away
- 1002 Karen AveSep 28, 2026New 1-story addition to enlarge kitchen and enclose back patio add uncovered wood deck partial garage conversion to laundry room demolition as noted in plans. full kitchen remodel remodel 3 bathrooms to 3.5 move water heater concrete hvac plumbing and electrical as needed to remodel kitchen · 97 m away
- 1000 Karen AveJul 6, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 3 ton 16 seer2 two stage condenser evaporator coil and gas furnace · 99 m away
- 1004 Karen AveSep 29, 2026New construction accessory use in-ground pool and spa with concrete decking · 100 m away
- 1006 Karen AveAug 25, 2025Replace existing main electrical service with 125a oh at existing location. add mechanical interlock kit inlet receptacle power to ev charger at carport and ring camera near carport · 105 m away