908 Payne Ave
Austin, TX 78757
908 Payne Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 908 Payne Ave, Austin, TX 78757. The most recent, filed June 3, 2024, covers: “Find and repair gas leak”.
Compiled from City of Austin records · updated Jun 3, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 3, 2024
- since Jun 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledFind and repair gas leak
- AppliedJun 3, 2024
- IssuedJun 3, 2024
- WorkJun '24 – Jun '24
- Final inspectionJun 4, 2024
Passed final inspection Jun 4, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectFind and repair gas leak
Find and repair gas leak
City of Austin permitPlumbing PermitFinal- Record
- 2024-069273 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 908 Payne Ave
What is being built at 908 Payne Ave?
The latest filing (City of Austin permit 2024-069273 PP, June 3, 2024) covers find and repair gas leak.
How many permits and filings does 908 Payne Ave have?
1 filing across 1 project, from June 3, 2024 to June 3, 2024.
Is there other construction near 908 Payne Ave?
Yes. Nearby filings include 1000 Payne Ave (construct new driveway approach of 12 ft. no sidewalk inspection per plan review, Sep 12, 2025); 906 Payne Ave (total demolition of sfr 1128 sq ft circa 1952 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage, Sep 22, 2026); 1002 Payne Ave (replacement of complete existing central heat and air system with or without duct work, Apr 17, 2024).
How do I get alerts for new permits at 908 Payne Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1000 Payne AveSep 12, 2025Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 18 m away
- 906 Payne AveSep 22, 2026Total demolition of sfr 1128 sq ft circa 1952 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 18 m away
- 1002 Payne AveApr 17, 2024Replacement of complete existing central heat and air system with or without duct work · 36 m away
- 907 Karen AveNov 16, 2026Installation of a 200a service-rated automatic transfer switch 26kw whole home generator additional grounding and type 2 surge protection · 55 m away
- 900 Payne AveAug 4, 202560 trench replace yard sewer and 15 tunnel below the foundation to expose 4 inch cast-iron main and replace with schedule 40 pvc. relocation and re-install of tankless water heater. relocate and install new gas service to outdoor closet that will receive heater · 74 m away
- 1007 Payne AveOct 14, 2026Replace sewer line from home to city tap connection. total length of sewer line approximately 55 feet · 80 m away
- 905 Payne AveJun 9, 2025Interior remodel to move kitchen. 500 sq ft remodel · 92 m away
- 901 Karen AveDec 9, 2024Replacement of complete existing central heat and air system with or without duct work · 92 m away
- 1010 Arcadia AveDec 4, 2023Replace existing water heater · 99 m away
- 1000 Karen AveJul 6, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 3 ton 16 seer2 two stage condenser evaporator coil and gas furnace · 99 m away
- 1002 Karen AveSep 28, 2026New 1-story addition to enlarge kitchen and enclose back patio add uncovered wood deck partial garage conversion to laundry room demolition as noted in plans. full kitchen remodel remodel 3 bathrooms to 3.5 move water heater concrete hvac plumbing and electrical as needed to remodel kitchen · 103 m away
- 1009 Karen AveAug 6, 2025Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 108 m away