City of Austin lists 1 filing across 1 project at 900 Payne Ave, Austin, TX 78757. The most recent, filed August 4, 2025, covers: “60 trench replace yard sewer and 15 tunnel below the foundation to expose 4 inch cast-iron main and replace with schedule 40 pvc. relocation and re-install of tankless water heater. relocate and install new gas service to outdoor closet that will receive heater”.
Compiled from City of Austin records · updated Aug 4, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Aug 4, 2025
- since Aug 4, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expired60 trench replace yard sewer and 15 tunnel below the foundation to expose 4 inch cast-iron main and replace with schedule 40 pvc. relocation and re-install of tankless water heater. relocate and install new gas service to outdoor closet that will receive heater
- AppliedJul 17, 2025
- IssuedAug 4, 2025
- !WorkAug '25 – Feb '26
- Final inspection
Marked expired Feb 10, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 project60 trench replace yard sewer and 15 tunnel below the foundation to expose 4 inch cast-iron main and replace with schedule 40 pvc. relocation and re-install of tankless water heater. relocate and install new gas service to outdoor closet that will receive heater
60 trench replace yard sewer and 15 tunnel below the foundation to expose 4 inch cast-iron main and replace with schedule 40 pvc. relocation and re-install of tankless water heater. relocate and install new gas service to outdoor closet that will receive heater
City of Austin permitPlumbing PermitExpired- Record
- 2025-089015 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 900 Payne Ave
What is being built at 900 Payne Ave?
The latest filing (City of Austin permit 2025-089015 PP, August 4, 2025) covers 60 trench replace yard sewer and 15 tunnel below the foundation to expose 4 inch cast-iron main and replace with schedule 40 pvc. relocation and re-install of tankless water heater. relocate and install new gas service to outdoor closet that will receive heater.
How many permits and filings does 900 Payne Ave have?
1 filing across 1 project, from August 4, 2025 to August 4, 2025.
What is being built near 6500 Nl in Austin?
900 Payne Ave is about 143 m from 6500 Nl (6500 N Lamar Boulevard). Its latest filing is for 60 trench replace yard sewer and 15 tunnel below the foundation to expose 4 inch cast-iron main and replace with schedule 40 pvc. relocation and re-install of tankless water heater. relocate and install new gas service to outdoor closet that will receive heater.
Is there other construction near 900 Payne Ave?
Yes. Nearby filings include 905 Payne Ave (interior remodel to move kitchen. 500 sq ft remodel, Jun 9, 2025); 906 Payne Ave (total demolition of sfr 1128 sq ft circa 1952 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage, Sep 22, 2026); 901 Karen Ave (replacement of complete existing central heat and air system with or without duct work, Dec 9, 2024).
How do I get alerts for new permits at 900 Payne Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 905 Payne AveJun 9, 2025Interior remodel to move kitchen. 500 sq ft remodel · 41 m away
- 906 Payne AveSep 22, 2026Total demolition of sfr 1128 sq ft circa 1952 ***the building shall not be demolished until after the contractor has fulfilled the neighbor notification requirements outlined in steps 5 & 6 of the demolition webpage · 55 m away
- 901 Karen AveDec 9, 2024Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 908 Payne AveJun 3, 2024Find and repair gas leak · 74 m away
- 907 Karen AveNov 16, 2026Installation of a 200a service-rated automatic transfer switch 26kw whole home generator additional grounding and type 2 surge protection · 90 m away
- 1000 Payne AveSep 12, 2025Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 91 m away
- 6500 N Lamar BlvdSep 15, 2025Underground network consisting of 24 and 108 diameter pipe restoration of concrete as required above ground installation of three (3) pickup kiosks and overhead cnaopy installation · 104 m away
- 1002 Payne AveApr 17, 2024Replacement of complete existing central heat and air system with or without duct work · 109 m away
- 6416 Lamar BlvdNov 18, 2026Jci thred gills · 123 m away
- 6313 Wild StApr 19, 2024Upgrade main electric service and replace sub panel · 126 m away
- 1000 Karen AveJul 6, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 3 ton 16 seer2 two stage condenser evaporator coil and gas furnace · 133 m away
- 1001 Arcadia AveMay 6, 2024Replacement of complete existing central heat and air system with or without duct work · 136 m away