1003 Ruth Ave
Austin, TX 78757
1003 Ruth Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 1003 Ruth Ave, Austin, TX 78757. The most recent, filed December 8, 2023, covers: “Construct new driveway approach of 12 ft curb & gutter of 20 ft”.
Compiled from City of Austin records · updated Dec 8, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 8, 2023
- since Dec 8, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConstruct new driveway approach of 12 ft curb & gutter of 20 ft
- AppliedNov 15, 2023
- IssuedDec 8, 2023
- WorkDec '23 – Jan '24
- Final inspectionJan 3, 2024
Passed final inspection Jan 3, 2024.
Permit & project history
1 projectConstruct new driveway approach of 12 ft curb & gutter of 20 ft
Construct new driveway approach of 12 ft curb & gutter of 20 ft
City of Austin permitDriveway / SidewalksFinal- Record
- 2023-148476 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1003 Ruth Ave
What is being built at 1003 Ruth Ave?
The latest filing (City of Austin permit 2023-148476 DS, December 8, 2023) covers construct new driveway approach of 12 ft curb & gutter of 20 ft.
How many permits and filings does 1003 Ruth Ave have?
1 filing across 1 project, from December 8, 2023 to December 8, 2023.
Is there other construction near 1003 Ruth Ave?
Yes. Nearby filings include 1005 Ruth Ave (upgrade overhead service from 125a 120/240v single-phase to 300a 120/240v single-phase. replace meter socket replace mast install new wire in mast and install new service disconnect. (1) 200a main breaker and (1) 100a main breaker, Jun 11, 2024); 1001 Ruth Ave ((baumgardner neel) - installation of circuit for elec. vehicle charging station - esip, Aug 14, 2024); 1004 Ruth Ave (express: 13 window install and 3 doors, Jun 18, 2025).
How do I get alerts for new permits at 1003 Ruth Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1005 Ruth AveJun 11, 2024Upgrade overhead service from 125a 120/240v single-phase to 300a 120/240v single-phase. replace meter socket replace mast install new wire in mast and install new service disconnect. (1) 200a main breaker and (1) 100a main breaker · 22 m away
- 1001 Ruth AveAug 14, 2024(baumgardner neel) - installation of circuit for elec. vehicle charging station - esip · 27 m away
- 1004 Ruth AveJun 18, 2025Express: 13 window install and 3 doors · 45 m away
- 1002 Brentwood StMar 19, 2026Building 1: new construction 3-unit usen single-family residential 2-story 3 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio · 69 m away
- 1008 Ruth AveJan 12, 2024Replacement of complete existing central heat and air system with or without duct work · 80 m away
- 1006 Brentwood StFeb 8, 2024Replace sewer line from house to the city tap · 82 m away
- 906 Ruth AveJul 12, 2026Eplan: residential expedited review - new three unit res. new construction of a 3-story single family res. [4bed 5bath] with attached carport · 82 m away
- 1101 Ruth AveNov 4, 2026Install a full lawn sprinkler system · 92 m away
- 1100 Ruth AveApr 23, 2024Cap off water/waste water · 99 m away
- 1005 Brentwood StOct 28, 2025Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system · 109 m away
- 1009 Brentwood StFeb 12, 2026Crawlspace replacement for cast iron · 120 m away
- 1102 Brentwood StJun 13, 2024Replacement of complete existing central heat and air system with or without duct work · 132 m away