1005 Brentwood St
Austin, TX 78757
HVAC and water heater replacements at 1005 Brentwood St
Austin permits show a water heater replacement at 1005 Brentwood St on September 3, 2024, followed by replacement of the complete central heating and air system on October 28, 2025. Both permits are marked final.
Summarized from City of Austin records · updated Oct 28, 2025
- Projects
- 2
- 2 filings
- Latest filing
- Oct 28, 2025
- since Sep 3, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system
- AppliedOct 27, 2025
- IssuedOct 28, 2025
- WorkOct '25 – Dec '25
- Final inspectionDec 3, 2025
Passed final inspection Dec 3, 2025.
1 contact on this project · 1 phone number
Permit & project history
2 projectsReplacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system
Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system
City of Austin permitMechanical PermitFinal- Record
- 2025-138477 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of an existing water heater
Replacement of an existing water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-109653 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1005 Brentwood St
What is being built at 1005 Brentwood St?
The permits do not indicate new construction. They cover replacement of an existing water heater and the complete central heating and air system.
Was a new HVAC system permitted at 1005 Brentwood St?
Yes. Permit 2025-138477 MP, dated October 28, 2025, covers replacement of the existing central heat and air system with a 2.5-ton horizontal gas system.
When was the HVAC replacement permitted at 1005 Brentwood St?
The City of Austin issued permit 2025-138477 MP on October 28, 2025. It is marked final.
Was a water heater replaced at 1005 Brentwood St?
Yes. Plumbing permit 2024-109653 PP, dated September 3, 2024, covers replacement of an existing water heater. It is marked final.
Are there permits for new construction at 1005 Brentwood St?
The two City of Austin permits in the records cover a water heater replacement and an HVAC system replacement, not new construction.
Also being built nearby
All of 78757- 1009 Brentwood StFeb 12, 2026Crawlspace replacement for cast iron · 36 m away
- 1002 Brentwood StMar 19, 2026Building 1: new construction 3-unit usen single-family residential 2-story 3 bedroom 2.5 bath with attached 2-car garage covered front porch and covered rear patio · 42 m away
- 1006 Brentwood StFeb 8, 2024Replace sewer line from house to the city tap · 56 m away
- 1006 Karen AveAug 25, 2025Replace existing main electrical service with 125a oh at existing location. add mechanical interlock kit inlet receptacle power to ev charger at carport and ring camera near carport · 58 m away
- 1011 Brentwood StMay 8, 2026Replacement of complete existing central heat and air system with or without duct work · 59 m away
- 1004 Karen AveSep 29, 2026New construction accessory use in-ground pool and spa with concrete decking · 61 m away
- 1002 Karen AveSep 28, 2026New 1-story addition to enlarge kitchen and enclose back patio add uncovered wood deck partial garage conversion to laundry room demolition as noted in plans. full kitchen remodel remodel 3 bathrooms to 3.5 move water heater concrete hvac plumbing and electrical as needed to remodel kitchen · 71 m away
- 1000 Karen AveJul 6, 2026Replacement of complete existing central heat and air system with or without duct work 1 system: 3 ton 16 seer2 two stage condenser evaporator coil and gas furnace · 82 m away
- 1009 Karen AveAug 6, 2025Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 101 m away
- 905 Brentwood StDec 6, 2023Replacement of complete existing central heat and air system with or without duct work · 104 m away
- 1005 Ruth AveJun 11, 2024Upgrade overhead service from 125a 120/240v single-phase to 300a 120/240v single-phase. replace meter socket replace mast install new wire in mast and install new service disconnect. (1) 200a main breaker and (1) 100a main breaker · 109 m away
- 1003 Ruth AveDec 8, 2023Construct new driveway approach of 12 ft curb & gutter of 20 ft · 109 m away