groundranger
Recent · latest filing Oct 2025Residential

1005 Brentwood St

Austin, TX 78757

HVAC and water heater replacements at 1005 Brentwood St

Austin permits show a water heater replacement at 1005 Brentwood St on September 3, 2024, followed by replacement of the complete central heating and air system on October 28, 2025. Both permits are marked final.

Summarized from City of Austin records · updated Oct 28, 2025

Projects
2
2 filings
Latest filing
Oct 28, 2025
since Sep 3, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system

  1. AppliedOct 27, 2025
  2. IssuedOct 28, 2025
  3. WorkOct '25 – Dec '25
  4. Final inspectionDec 3, 2025

Passed final inspection Dec 3, 2025.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system

    Replacement of complete existing central heat and air system with or without duct work like for like: 2.5 ton horizontal gas system

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Replacement of an existing water heater

    Replacement of an existing water heater

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1005 Brentwood St

What is being built at 1005 Brentwood St?

The permits do not indicate new construction. They cover replacement of an existing water heater and the complete central heating and air system.

Was a new HVAC system permitted at 1005 Brentwood St?

Yes. Permit 2025-138477 MP, dated October 28, 2025, covers replacement of the existing central heat and air system with a 2.5-ton horizontal gas system.

When was the HVAC replacement permitted at 1005 Brentwood St?

The City of Austin issued permit 2025-138477 MP on October 28, 2025. It is marked final.

Was a water heater replaced at 1005 Brentwood St?

Yes. Plumbing permit 2024-109653 PP, dated September 3, 2024, covers replacement of an existing water heater. It is marked final.

Are there permits for new construction at 1005 Brentwood St?

The two City of Austin permits in the records cover a water heater replacement and an HVAC system replacement, not new construction.

Also being built nearby

All of 78757
Email me when a new permit is filed