Level 2 EV charger permitted at 1113 Taulbee Ln
A Level 2 EV charger installation was permitted at 1113 Taulbee Ln on October 23, 2026. Austin permit 2026-138033 EP is marked final; the record does not list a project cost.
Summarized from City of Austin records · updated Oct 23, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Oct 23, 2026
- since Feb 11, 2009
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedOct 20, 2026
- IssuedOct 23, 2026
- WorkOct '26 – Apr '27
- Final inspectionNov 1, 2026
Passed final inspection Nov 1, 2026.
1 contact on this project · 1 phone number
Permit & project history
3 projectsInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2026-138033 EP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work
Replacement of complete existing central heat and air system with or without duct work
City of Austin permitMechanical PermitFinal- Record
- 2024-000274 MP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1113 Taulbee Ln
What is being built at 1113 Taulbee Ln?
Austin records show a Level 2 EV charger installation at the address. Permit 2026-138033 EP was filed October 23, 2026, and is marked final.
When was the EV charger permitted at 1113 Taulbee Ln?
The City of Austin permit is dated October 23, 2026. Its permit number is 2026-138033 EP.
What kind of EV charger is being installed at 1113 Taulbee Ln?
The permit description specifies a Level 2 EV charger.
Is a new commercial building being built at 1113 Taulbee Ln?
The records provided show a Level 2 EV charger installation, not a new building permit. They also include an approved subdivision case from 2009.
How much will the project at 1113 Taulbee Ln cost?
The permit record does not list a project valuation or cost estimate.
What is permit 2026-138033 EP for in Austin?
It is a City of Austin electrical permit for installing a Level 2 EV charger at 1113 Taulbee Ln. The permit is dated October 23, 2026, and marked final.
Also being built nearby
All of 78757- 1201 Taulbee LnNov 29, 2023Replacement of complete existing central heat and air system with or without duct work · 36 m away
- 1205 Taulbee LnSep 17, 2026Install level 2 ev charger · 57 m away
- 1107 Taulbee LnJan 5, 2024Installation of a level 2 ev charger. wire run will be from the outside panel along side the wall to charger location outside the garage · 67 m away
- 1200 Taulbee LnJul 25, 2025New prefabricated plungie max swim spa (20x10) pool equipment connected to existing house service · 73 m away
- 1200 Morrow StJun 13, 2025Install level 2 ev charger · 74 m away
- 1206 Taulbee LnJul 8, 2024Express foundation repair · 86 m away
- 1211 Taulbee LnFeb 13, 2026Interlock kit on outdoor sub-panel installation · 99 m away
- 7608 Watson StMar 16, 2009North gate addition, block g, resub of lots 1 & 2 — north gate addition, block g, resub of lots 1 & 2 · 102 m away
- 7614 Watson StJun 6, 2024Upgrade main electrical services · 111 m away
- 7602 Watson StJul 17, 2024Replacement of complete existing central heat and air system with or without duct work · 114 m away
- 1100 Taulbee LnMay 6, 2014Blazek subdivision · 121 m away
- 7601 Gault StOct 30, 2026Replacement of complete existing central heat and air system with or without duct work · 123 m away