1200 Morrow St
Austin, TX 78757
1200 Morrow St: 1 project on record
City of Austin lists 1 filing across 1 project at 1200 Morrow St, Austin, TX 78757. The most recent, filed June 13, 2025, covers: “Install level 2 ev charger”.
Compiled from City of Austin records · updated Jun 13, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jun 13, 2025
- since Jun 13, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledInstall level 2 ev charger
- AppliedJun 12, 2025
- IssuedJun 13, 2025
- WorkJun '25 – Dec '25
- Final inspectionJul 13, 2026
Passed final inspection Jul 13, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectInstall level 2 ev charger
Install level 2 ev charger
City of Austin permitElectrical PermitFinal- Record
- 2025-072873 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1200 Morrow St
What is being built at 1200 Morrow St?
The latest filing (City of Austin permit 2025-072873 EP, June 13, 2025) covers install level 2 ev charger.
How many permits and filings does 1200 Morrow St have?
1 filing across 1 project, from June 13, 2025 to June 13, 2025.
Is there other construction near 1200 Morrow St?
Yes. Nearby filings include 1113 Taulbee Ln (install level 2 ev charger, Oct 23, 2026); 7601 Gault St (replacement of complete existing central heat and air system with or without duct work, Oct 30, 2026); 1201 Taulbee Ln (replacement of complete existing central heat and air system with or without duct work, Nov 29, 2023).
How do I get alerts for new permits at 1200 Morrow St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1113 Taulbee LnOct 23, 2026Install level 2 ev charger · 74 m away
- 7601 Gault StOct 30, 2026Replacement of complete existing central heat and air system with or without duct work · 83 m away
- 1201 Taulbee LnNov 29, 2023Replacement of complete existing central heat and air system with or without duct work · 94 m away
- 1205 Taulbee LnSep 17, 2026Install level 2 ev charger · 97 m away
- 1107 Taulbee LnJan 5, 2024Installation of a level 2 ev charger. wire run will be from the outside panel along side the wall to charger location outside the garage · 124 m away
- 7602 Watson StJul 17, 2024Replacement of complete existing central heat and air system with or without duct work · 128 m away
- 7608 Watson StMar 16, 2009North gate addition, block g, resub of lots 1 & 2 — north gate addition, block g, resub of lots 1 & 2 · 129 m away
- 1211 Taulbee LnFeb 13, 2026Interlock kit on outdoor sub-panel installation · 129 m away
- 7604 Gault StFeb 12, 2025Replacement of complete existing central heat and air system with or without duct work · 133 m away
- 1200 Taulbee LnJul 25, 2025New prefabricated plungie max swim spa (20x10) pool equipment connected to existing house service · 145 m away
- 1206 Taulbee LnJul 8, 2024Express foundation repair · 148 m away
- 7608 Gault StFeb 22, 2024New 2 story secondary dwelling to the rear of the main house · 150 m away