1409 Kamar Dr
Austin, TX 78757
1409 Kamar Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 1409 Kamar Dr, Austin, TX 78757. The most recent, filed April 12, 2024, covers: “Plumbing repair below slab and will reroute sewer”.
Compiled from City of Austin records · updated Apr 12, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Apr 12, 2024
- since Apr 12, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredPlumbing repair below slab and will reroute sewer
- AppliedApr 11, 2024
- IssuedApr 12, 2024
- !WorkApr '24 – Oct '24
- Final inspection
Marked expired Oct 16, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectPlumbing repair below slab and will reroute sewer
Plumbing repair below slab and will reroute sewer
City of Austin permitPlumbing PermitExpired- Record
- 2024-045691 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1409 Kamar Dr
What is being built at 1409 Kamar Dr?
The latest filing (City of Austin permit 2024-045691 PP, April 12, 2024) covers plumbing repair below slab and will reroute sewer.
How many permits and filings does 1409 Kamar Dr have?
1 filing across 1 project, from April 12, 2024 to April 12, 2024.
Is there other construction near 1409 Kamar Dr?
Yes. Nearby filings include 1410 Kamar Dr (tunnel under foundation to replace cast iron drain lines for one full bathroom kitchen and washer drain line. kitchen and washer drain line will be rerouted to the right side of the property we will not reroute sewer line and instead tunnel under foundation in the same locations where our access holes are but tunnel from left to right of the home total length of tunnel is 55 feet and sewer line is approximately 3 feet to the tap from the home, Jul 3, 2026); 1410 Beckett St (replace 2 - 40 gal gas water heaters, Jan 6, 2026); 1412 Kamar Dr (express: remove main electrical panel to replace siding and trim, Mar 11, 2026).
How do I get alerts for new permits at 1409 Kamar Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1410 Kamar DrJul 3, 2026Tunnel under foundation to replace cast iron drain lines for one full bathroom kitchen and washer drain line. kitchen and washer drain line will be rerouted to the right side of the property we will not reroute sewer line and instead tunnel under foundation in the same locations where our access holes are but tunnel from left to right of the home total length of tunnel is 55 feet and sewer line is approximately 3 feet to the tap from the home · 44 m away
- 1410 Beckett StJan 6, 2026Replace 2 - 40 gal gas water heaters · 54 m away
- 1412 Kamar DrMar 11, 2026Express: remove main electrical panel to replace siding and trim · 58 m away
- 1412 Beckett StJun 20, 2024Partial sewer drain repair under home laundry and kitchen only (tunnel) · 64 m away
- 1402 Beckett StJun 9, 2025I need to get a stand alone permit for 1402 becket street and for a meter rack for permit # 2024-098020 ep 2024-098021 ep 2024-098022 ep · 78 m away
- 1417 Kamar DrMar 13, 2026Replace kitchen branch line approximately 50 feet under slab in tunnel · 79 m away
- 1403 Beckett StOct 19, 2026Eplan: residential expedited review - new construction of 2-story single family res. [5bed 3bath] with attached garage · 112 m away
- 8205 Lazy LnJul 29, 2025(denecke morgan / myung chul kim and moonjung choi) - installation of circuit for elec. vehicle charging station - esip · 115 m away
- 8204 Kromer StJun 11, 2025Install new 6.375 kw rooftop solar system and 13.5 kw energy storage system for existing residential only · 122 m away
- 1501 Beckett StJul 20, 2026125-amp overhead service rebuild · 130 m away
- 8203 Polar DrMar 10, 202540 trench to replace the yard sewer line · 158 m away
- 8302 Kromer StJul 23, 2025Brown - install new 7.6kw rooftop solar system to existing residential only using backfed breaker · 159 m away