1800 Princeton Ave
Austin, TX 78757
Under-slab cast-iron pipe replacement permitted at 1800 Princeton Ave
A plumbing permit at 1800 Princeton Ave covers tunneling and replacing cast-iron piping beneath the slab. The City of Austin permit was filed May 12, 2026, and is marked final.
Summarized from City of Austin records · updated May 12, 2026
- Projects
- 1
- 1 filings
- Latest filing
- May 12, 2026
- since May 12, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledTunnel and replace castiron under slab
- AppliedApr 29, 2026
- IssuedMay 12, 2026
- WorkMay '26 – May '26
- Final inspectionMay 28, 2026
Passed final inspection May 28, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectTunnel and replace castiron under slab
Tunnel and replace castiron under slab
City of Austin permitPlumbing PermitFinal- Record
- 2026-052992 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1800 Princeton Ave
What is happening at 1800 Princeton Ave in Austin?
A City of Austin plumbing permit indicates work to tunnel beneath the slab and replace cast-iron piping. Permit 2026-052992 PP was filed May 12, 2026.
Is new construction planned at 1800 Princeton Ave?
The available record is for under-slab plumbing work, not a new building. It describes tunneling and replacing cast-iron piping.
When was the plumbing permit for 1800 Princeton Ave filed?
The permit was filed May 12, 2026. The record lists its status as final.
What does permit 2026-052992 PP cover?
The City of Austin permit covers tunneling and replacing cast-iron piping beneath the slab at 1800 Princeton Ave.
Is the work at 1800 Princeton Ave a plumbing project?
Yes. The City of Austin record classifies permit 2026-052992 PP as a plumbing permit.
Also being built nearby
All of 78757- 1806 Princeton AveApr 27, 2026Irrigation installation · 55 m away
- 1803 Barbara StApr 25, 2024Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 1711 Barbara StJan 23, 2024Heat pump replacement · 60 m away
- 1805 Barbara StOct 28, 2026Construct new driveway approach of 16 ft and curb & gutter of 16 ft. no sidewalk inspection per plan review · 64 m away
- 1800 Barbara StMar 30, 2026Request to disconnect new 200 amp over head service whole house surge protection gas ground additional grounding inter-system ground · 102 m away
- 1804 Barbara StMay 16, 2024Install level 2 ev charger per austin energys plug-in rebate guidelines · 105 m away
- 1702 Princeton AveSep 17, 2024Replacement of an existing water heater · 111 m away
- 1704 Barbara StMay 7, 2026Install/replace 150 amp main breaker panel; install/replace 200 amp meter enclosure and riser (overhead service); install complete grounding and bonding system; install surge protection · 124 m away
- 7706 Rutgers AveDec 16, 2025Install a full lawn sprinkler system · 128 m away
- 1715 Dartmouth AveNov 4, 2026Base: installing a backup battery system and additional meter socket · 143 m away
- 7804 Rutgers AveAug 26, 2026Upgrade service 200amp service · 143 m away
- 1508 Princeton AveFeb 9, 2026Replacing 70 foot sewer yard line · 144 m away