1802 Cullen Ave
Austin, TX 78757
1802 Cullen Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 1802 Cullen Ave, Austin, TX 78757. The most recent, filed July 15, 2025, covers: “Service re build”.
Compiled from City of Austin records · updated Jul 15, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 15, 2025
- since Jul 15, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredService re build
- AppliedJul 10, 2025
- IssuedJul 15, 2025
- !WorkJul '25 – Feb '26
- Final inspection
Marked expired Feb 2, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectService re build
Service re build
City of Austin permitElectrical PermitExpired- Record
- 2025-085999 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1802 Cullen Ave
What is being built at 1802 Cullen Ave?
The latest filing (City of Austin permit 2025-085999 EP, July 15, 2025) covers service re build.
How many permits and filings does 1802 Cullen Ave have?
1 filing across 1 project, from July 15, 2025 to July 15, 2025.
Is there other construction near 1802 Cullen Ave?
Yes. Nearby filings include 1800 Cullen Ave (install new 20kw energy storage system for existing residential only, Jun 17, 2026); 1804 Cullen Ave (new pool (autofill/heated) not needed----cm, May 20, 2026); 7012 Yates Ave (construct new driveway approach of 12 ft, Sep 28, 2026).
How do I get alerts for new permits at 1802 Cullen Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1800 Cullen AveJun 17, 2026Install new 20kw energy storage system for existing residential only · 15 m away
- 1804 Cullen AveMay 20, 2026New pool (autofill/heated) not needed----cm · 20 m away
- 7012 Yates AveSep 28, 2026Construct new driveway approach of 12 ft · 25 m away
- 1806 Cullen AveOct 8, 2026Interior remodel primary bathroom remodel includes converting tub into shower capping 2 vanity supply lines adding new vanity supply line modifying plumbing as required for the new shower construct 2 new pony walls and preparing them for finishes relocating electrical outlets from vanity wall to designated back wall · 38 m away
- 1803 Cullen AveFeb 20, 2025Replacement of complete existing central heat and air system with or without duct work · 46 m away
- 1801 Cullen AveMar 3, 2025Replacement of an existing water heater gas tankless changeout · 47 m away
- 1807 Cullen AveOct 14, 2025Re-plumb gas lines to whole home · 59 m away
- 1807 W St Johns AveSep 25, 2025Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be (2) access holes (1) near the kitchen and (1) at the sewer clean-out · 69 m away
- 1809 Cullen AveFeb 26, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 2-ton vertical gas hvac system with like-for-like unit (hvac changeout/alteration); no structural change · 73 m away
- 1717 Cullen AveApr 3, 2025Reconfigure bedroom bathroom kitchen living and dining · 81 m away
- 1715 Cullen AveOct 27, 2026Replacement of existing gas water heater with similar model · 94 m away
- 1811 W St Johns AveJul 1, 2024Install new mini split · 95 m away