1806 Cullen Ave
Austin, TX 78757
Bathroom remodel and home system upgrades at 1806 Cullen Ave
Permits at 1806 Cullen Ave indicate a primary bathroom remodel, including replacing the tub with a shower, plus updates to the home’s heating and electrical systems. The records also include a main water line replacement permitted April 10, 2026, and later permits for HVAC and bathroom work filed between June and October 2026.
Summarized from City of Austin records · updated Oct 8, 2026
- Projects
- 5
- 5 filings
- Latest filing
- Oct 8, 2026
- since Apr 10, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit active · work underwayInterior remodel primary bathroom remodel includes converting tub into shower capping 2 vanity supply lines adding new vanity supply line modifying plumbing as required for the new shower construct 2 new pony walls and preparing them for finishes relocating electrical outlets from vanity wall to designated back wall
- AppliedSep 16, 2026
- IssuedOct 8, 2026
- WorkOct '26 – May '27
- Final inspection
1 contact on this project · 1 phone number
Permit & project history
5 projectsInterior remodel primary bathroom remodel includes converting tub into shower capping 2 vanity supply lines adding new vanity supply line modifying plumbing as required for the new shower construct 2 new pony walls and preparing them for finishes relocating electrical outlets from vanity wall to designated back wall
Interior remodel primary bathroom remodel includes converting tub into shower capping 2 vanity supply lines adding new vanity supply line modifying plumbing as required for the new shower construct 2 new pony walls and preparing them for finishes relocating electrical outlets from vanity wall to designated back wall
City of Austin permitPlumbing PermitActive- Record
- 2026-131236 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Interior remodel primary bathroom remodel includes converting tub into shower capping 2 vanity supply lines adding new vanity supply line modifying plumbing as required for the new shower construct 2 new pony walls and preparing them for finishes relocating electrical outlets from vanity wall to designated back wall
Interior remodel primary bathroom remodel includes converting tub into shower capping 2 vanity supply lines adding new vanity supply line modifying plumbing as required for the new shower construct 2 new pony walls and preparing them for finishes relocating electrical outlets from vanity wall to designated back wall
City of Austin permitBuilding PermitActive- Record
- 2026-131236 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton two stage vertical heat pump
Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton two stage vertical heat pump
City of Austin permitMechanical PermitActive- Record
- 2026-079888 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Converting a gas furnace to electric. installing wiring to the new unit inside
Converting a gas furnace to electric. installing wiring to the new unit inside
City of Austin permitElectrical PermitActive- Record
- 2026-080772 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Replace main water line 25 ft
Replace main water line 25 ft
City of Austin permitPlumbing PermitFinal- Record
- 2026-042656 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1806 Cullen Ave
What is being built at 1806 Cullen Ave?
Permits indicate renovations and system upgrades to an existing home, not a new building. The work includes a primary bathroom remodel, HVAC updates, electrical work and a main water line replacement.
Is 1806 Cullen Ave getting a new bathroom?
A primary bathroom remodel was permitted October 8, 2026, under permits 2026-131236 PP and 2026-131236 BP. The scope includes converting a tub to a shower, adding pony walls and modifying plumbing and electrical outlets.
What HVAC work is planned at 1806 Cullen Ave?
A July 1, 2026 mechanical permit, 2026-079888 MP, covers replacing the existing central heating and air system with a 3-ton, two-stage vertical heat pump. A June 26 electrical permit, 2026-080772 EP, covers wiring associated with converting a gas furnace to electric.
When were permits filed for 1806 Cullen Ave?
The records span April 10 through October 8, 2026. The latest listed permits are 2026-131236 PP and 2026-131236 BP for the primary bathroom remodel.
Was the water line at 1806 Cullen Ave replaced?
A plumbing permit filed April 10, 2026, covers replacing 25 feet of the main water line. Permit 2026-042656 PP is listed as final.
Also being built nearby
All of 78757- 1804 Cullen AveMay 20, 2026New pool (autofill/heated) not needed----cm · 18 m away
- 1802 Cullen AveJul 15, 2025Service re build · 38 m away
- 1807 Cullen AveOct 14, 2025Re-plumb gas lines to whole home · 42 m away
- 1809 Cullen AveFeb 26, 2026Replacement of complete existing central heat and air system with or without duct work replace existing 2-ton vertical gas hvac system with like-for-like unit (hvac changeout/alteration); no structural change · 47 m away
- 1800 Cullen AveJun 17, 2026Install new 20kw energy storage system for existing residential only · 53 m away
- 1803 Cullen AveFeb 20, 2025Replacement of complete existing central heat and air system with or without duct work · 57 m away
- 1807 W St Johns AveSep 25, 2025Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be (2) access holes (1) near the kitchen and (1) at the sewer clean-out · 60 m away
- 7012 Yates AveSep 28, 2026Construct new driveway approach of 12 ft · 63 m away
- 1801 Cullen AveMar 3, 2025Replacement of an existing water heater gas tankless changeout · 68 m away
- 1811 W St Johns AveJul 1, 2024Install new mini split · 71 m away
- 1814 Cullen AveOct 12, 2026Panel upgrade · 74 m away
- 1813 W St Johns AveJun 5, 2024Installation of level 2 ev charger using a weather box nema 1415 plug. wire run consisting of seu 4 wire will be from outside panel connected to a 50amp gfci breaker run the wire under the house to the back of the house where it will connect to a non-fusible disconnect and finish the run using 6/3 copper romex wire to the plug · 80 m away