groundranger
Historic · latest filing May 2024Residential

1804 Kingwood Cv

Austin, TX 78757

1804 Kingwood Cv: 1 project on record

City of Austin lists 1 filing across 1 project at 1804 Kingwood Cv, Austin, TX 78757. The most recent, filed May 31, 2024, covers: “80 tunnel below the foundation 4 access holes to replace entire cast-iron drain system”.

Compiled from City of Austin records · updated May 31, 2024

Projects
1
1 filings
Latest filing
May 31, 2024
since May 31, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

80 tunnel below the foundation 4 access holes to replace entire cast-iron drain system

  1. AppliedMay 10, 2024
  2. IssuedMay 31, 2024
  3. WorkMay '24 – Jun '24
  4. Final inspectionJun 12, 2024

Passed final inspection Jun 12, 2024.

1 contact on this project · 1 phone number

Permit & project history

1 project
  1. 80 tunnel below the foundation 4 access holes to replace entire cast-iron drain system

    80 tunnel below the foundation 4 access holes to replace entire cast-iron drain system

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1804 Kingwood Cv

What is being built at 1804 Kingwood Cv?

The latest filing (City of Austin permit 2024-059344 PP, May 31, 2024) covers 80 tunnel below the foundation 4 access holes to replace entire cast-iron drain system.

How many permits and filings does 1804 Kingwood Cv have?

1 filing across 1 project, from May 31, 2024 to May 31, 2024.

Is there other construction near 1804 Kingwood Cv?

Yes. Nearby filings include 1806 Kingwood Cv (moving the electrical meter socket from its original location to the side of the home. replacing the meter socket and riser, May 28, 2025); 1803 Richwood Dr (addition/remodel. addition of a covered screened porch to rear of existing 2-story sfr. remodel of existing single-family residence. reconfiguration of interior walls to add laundry upstairs and half bath downstairs. complete replacement of existing cast iron plumbing with new plumbing. addition/remodel will result in a 4 bedroom 3.5 bathroom single family residence, Oct 11, 2024); 1811 Richwood Dr (replacement of complete existing central heat and air system with or without duct work, Nov 5, 2026).

How do I get alerts for new permits at 1804 Kingwood Cv?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78757
Email me when a new permit is filed