1808 W St Johns Ave
Austin, TX 78757
1808 W St Johns Ave: 1 project on record
City of Austin lists 1 filing across 1 project at 1808 W St Johns Ave, Austin, TX 78757. The most recent, filed May 30, 2025, covers: “Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2-stage horizontal gas system”.
Compiled from City of Austin records · updated May 30, 2025
- Projects
- 1
- 1 filings
- Latest filing
- May 30, 2025
- since May 30, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2-stage horizontal gas system
- AppliedMay 27, 2025
- IssuedMay 30, 2025
- WorkMay '25 – Nov '25
- Final inspectionNov 24, 2025
Passed final inspection Nov 24, 2025.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2-stage horizontal gas system
Replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2-stage horizontal gas system
City of Austin permitMechanical PermitFinal- Record
- 2025-065181 MP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1808 W St Johns Ave
What is being built at 1808 W St Johns Ave?
The latest filing (City of Austin permit 2025-065181 MP, May 30, 2025) covers replacement of complete existing central heat and air system with or without duct work like for like: 3 ton 2-stage horizontal gas system.
How many permits and filings does 1808 W St Johns Ave have?
1 filing across 1 project, from May 30, 2025 to May 30, 2025.
Is there other construction near 1808 W St Johns Ave?
Yes. Nearby filings include 1802 W St Johns Ave (express remove 12 existing windows & replace with new vinyl windows of same size & operations, Jun 18, 2024); 1807 W St Johns Ave (tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be (2) access holes (1) near the kitchen and (1) at the sewer clean-out, Sep 25, 2025); 1811 W St Johns Ave (install new mini split, Jul 1, 2024).
How do I get alerts for new permits at 1808 W St Johns Ave?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1802 W St Johns AveJun 18, 2024Express remove 12 existing windows & replace with new vinyl windows of same size & operations · 44 m away
- 1807 W St Johns AveSep 25, 2025Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be (2) access holes (1) near the kitchen and (1) at the sewer clean-out · 45 m away
- 1811 W St Johns AveJul 1, 2024Install new mini split · 53 m away
- 1809 Piedmont AveMay 6, 2026New inground pool and spa to rear of existing sfr · 54 m away
- 1813 W St Johns AveJun 5, 2024Installation of level 2 ev charger using a weather box nema 1415 plug. wire run consisting of seu 4 wire will be from outside panel connected to a 50amp gfci breaker run the wire under the house to the back of the house where it will connect to a non-fusible disconnect and finish the run using 6/3 copper romex wire to the plug · 63 m away
- 1818 W St Johns AveMay 21, 2026Construct new driveway approach of 12 ft. no sidewalk inspection per plan review · 76 m away
- 1815 W St Johns AveFeb 14, 2025*partial demolition* first and second-story addition with interior remodel · 81 m away
- 1901 W St Johns AveAug 5, 2025New pool and spa · 95 m away
- 1806 Piedmont AveSep 24, 2024Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 1812 Piedmont AveJul 29, 2026Irrigation installation · 100 m away
- 1802 Piedmont AveJul 25, 2024Installing 10.25 kw dc rooftop solar system. using 25 410w q-cell solar panels and 25 iq8plus enphase microinverters. using ironridge flush mount rail system · 104 m away
- 1806 Cullen AveOct 8, 2026Interior remodel primary bathroom remodel includes converting tub into shower capping 2 vanity supply lines adding new vanity supply line modifying plumbing as required for the new shower construct 2 new pony walls and preparing them for finishes relocating electrical outlets from vanity wall to designated back wall · 105 m away