groundranger
Historic · latest filing Oct 2024Residential

1909 Redlands St

Austin, TX 78757

1909 Redlands St: 2 projects on record

City of Austin lists 2 filings across 2 projects at 1909 Redlands St, Austin, TX 78757 since September 26, 2024. The most recent, filed October 3, 2024, covers: “Replacement of complete existing central heat and air system with or without duct work”.

Compiled from City of Austin records · updated Oct 3, 2024

Projects
2
2 filings
Latest filing
Oct 3, 2024
since Sep 26, 2024
Largest scope
—
Listed value
—

Where this project stands

Finaled

Replacement of complete existing central heat and air system with or without duct work

  1. AppliedSep 26, 2024
  2. IssuedOct 3, 2024
  3. WorkOct '24 – Apr '25
  4. Final inspectionNov 4, 2024

Passed final inspection Nov 4, 2024.

1 contact on this project · 1 phone number

Permit & project history

2 projects
  1. Replacement of complete existing central heat and air system with or without duct work

    Replacement of complete existing central heat and air system with or without duct work

    City of Austin permitMechanical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Install level 2 ev charger

    Install level 2 ev charger

    City of Austin permitElectrical PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 1909 Redlands St

What is being built at 1909 Redlands St?

The latest filing (City of Austin permit 2024-130407 MP, October 3, 2024) covers replacement of complete existing central heat and air system with or without duct work.

How many permits and filings does 1909 Redlands St have?

2 filings across 2 projects, from September 26, 2024 to October 3, 2024.

Is there other construction near 1909 Redlands St?

Yes. Nearby filings include 1908 Burbank St (upsize gas line to generator and incidentally to other exisitng gas appliances, Sep 18, 2025); 1905 Redlands St (replace yard sewer line and tunnel under the house and install rough-in and replace most of the waste line under the house. **there will be three tunnels and each will be about 10ft long. the access points are the back of the house for the kitchen the side of the house for middle bathroom and the front of the house for the front bathroom, May 29, 2025); 1910 Burbank St (dig on each end of the sewer yard line to burst and replace approximately 45 ft of line, Oct 17, 2025).

How do I get alerts for new permits at 1909 Redlands St?

Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.

Also being built nearby

All of 78757
Email me when a new permit is filed