1915 Burbank St
Austin, TX 78757
1915 Burbank St: 1 project on record
City of Austin lists 1 filing across 1 project at 1915 Burbank St, Austin, TX 78757. The most recent, filed October 10, 2024, covers: “65 foot tunnel to replace cast iron sewer line. access on left side of house”.
Compiled from City of Austin records · updated Oct 10, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Oct 10, 2024
- since Oct 10, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled65 foot tunnel to replace cast iron sewer line. access on left side of house
- AppliedSep 30, 2024
- IssuedOct 10, 2024
- WorkOct '24 – Nov '24
- Final inspectionNov 13, 2024
Passed final inspection Nov 13, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 project65 foot tunnel to replace cast iron sewer line. access on left side of house
65 foot tunnel to replace cast iron sewer line. access on left side of house
City of Austin permitPlumbing PermitFinal- Record
- 2024-131813 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 1915 Burbank St
What is being built at 1915 Burbank St?
The latest filing (City of Austin permit 2024-131813 PP, October 10, 2024) covers 65 foot tunnel to replace cast iron sewer line. access on left side of house.
How many permits and filings does 1915 Burbank St have?
1 filing across 1 project, from October 10, 2024 to October 10, 2024.
Is there other construction near 1915 Burbank St?
Yes. Nearby filings include 2016 Brentwood St (reroute water line from meter to house, Jun 20, 2024); 2014 Brentwood St (replacement of an existing water heater, Apr 14, 2026); 1910 Burbank St (dig on each end of the sewer yard line to burst and replace approximately 45 ft of line, Oct 17, 2025).
How do I get alerts for new permits at 1915 Burbank St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 2016 Brentwood StJun 20, 2024Reroute water line from meter to house · 41 m away
- 2014 Brentwood StApr 14, 2026Replacement of an existing water heater · 44 m away
- 1910 Burbank StOct 17, 2025Dig on each end of the sewer yard line to burst and replace approximately 45 ft of line · 61 m away
- 1909 Burbank StOct 26, 2026Eplan: residential expedited review - new construction of a 2-story single-family residence [5bed 4bath] with attached carport · 65 m away
- 6602 Laird DrMay 6, 2026Express: foundation repair · 70 m away
- 1908 Burbank StSep 18, 2025Upsize gas line to generator and incidentally to other exisitng gas appliances · 78 m away
- 6703 Modesto StAug 26, 2024Express: replace 6 windows and a patio door like for like · 82 m away
- 6600 Laird DrAug 22, 2024Provide underground power to a 196 sq ft shed install a sub-panel and wire shed for lights receptacles and ac window unit. add 120v underground power and lighting to a covered open storage area (192 sq ft) as well. each space is independent from each other. add an outlet with an interlock system on his panel for a generator system · 82 m away
- 2019 Brentwood StOct 28, 2026Base: installing a backup battery system and additional meter socket · 84 m away
- 6522 Laird DrMar 11, 2024Replacement of complete existing central heat and air system with or without duct work · 89 m away
- 2011 Brentwood StMay 8, 2026Gas to be on test before inspector can pass our final for replacing existing water heater · 99 m away
- 2006 Brentwood StFeb 21, 2025Replacement of complete existing central heat and air system with or without duct work located in attic · 101 m away