2016 Brentwood St
Austin, TX 78757
2016 Brentwood St: 1 project on record
City of Austin lists 1 filing across 1 project at 2016 Brentwood St, Austin, TX 78757. The most recent, filed June 20, 2024, covers: “Reroute water line from meter to house”.
Compiled from City of Austin records · updated Jun 20, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Jun 20, 2024
- since Jun 20, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReroute water line from meter to house
- AppliedJun 14, 2024
- IssuedJun 20, 2024
- WorkJun '24 – Jul '24
- Final inspectionJul 3, 2024
Passed final inspection Jul 3, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReroute water line from meter to house
Reroute water line from meter to house
City of Austin permitPlumbing PermitFinal- Record
- 2024-075263 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2016 Brentwood St
What is being built at 2016 Brentwood St?
The latest filing (City of Austin permit 2024-075263 PP, June 20, 2024) covers reroute water line from meter to house.
How many permits and filings does 2016 Brentwood St have?
1 filing across 1 project, from June 20, 2024 to June 20, 2024.
Is there other construction near 2016 Brentwood St?
Yes. Nearby filings include 2014 Brentwood St (replacement of an existing water heater, Apr 14, 2026); 1915 Burbank St (65 foot tunnel to replace cast iron sewer line. access on left side of house, Oct 10, 2024); 2019 Brentwood St (base: installing a backup battery system and additional meter socket, Oct 28, 2026).
How do I get alerts for new permits at 2016 Brentwood St?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 2014 Brentwood StApr 14, 2026Replacement of an existing water heater · 21 m away
- 1915 Burbank StOct 10, 202465 foot tunnel to replace cast iron sewer line. access on left side of house · 41 m away
- 2019 Brentwood StOct 28, 2026Base: installing a backup battery system and additional meter socket · 45 m away
- 6602 Laird DrMay 6, 2026Express: foundation repair · 63 m away
- 6522 Laird DrMar 11, 2024Replacement of complete existing central heat and air system with or without duct work · 64 m away
- 6600 Laird DrAug 22, 2024Provide underground power to a 196 sq ft shed install a sub-panel and wire shed for lights receptacles and ac window unit. add 120v underground power and lighting to a covered open storage area (192 sq ft) as well. each space is independent from each other. add an outlet with an interlock system on his panel for a generator system · 65 m away
- 2011 Brentwood StMay 8, 2026Gas to be on test before inspector can pass our final for replacing existing water heater · 70 m away
- 6520 Laird DrDec 31, 2025Upgrading existing oh service meter riser panel grounding and surge protector · 72 m away
- 1909 Burbank StOct 26, 2026Eplan: residential expedited review - new construction of a 2-story single-family residence [5bed 4bath] with attached carport · 79 m away
- 1910 Burbank StOct 17, 2025Dig on each end of the sewer yard line to burst and replace approximately 45 ft of line · 94 m away
- 2006 Brentwood StFeb 21, 2025Replacement of complete existing central heat and air system with or without duct work located in attic · 96 m away
- 2016 Karen AveJan 8, 2024Addition/remodel. addition of an expanded entry living room and new covered front porch to existing single family residence. addition of a 2nd story consisting of two bedrooms one bathroom and a game room. addition/remodel will result in a 4 bedroom 4 bathroom single family residence. roll in scope of work from expired mp#: 2016-130900 · 99 m away