2001 Teakwood Dr
Austin, TX 78757
2001 Teakwood Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 2001 Teakwood Dr, Austin, TX 78757. The most recent, filed December 4, 2023, covers: “Express: replace decking and asphalt shingles (not going past decking)”.
Compiled from City of Austin records · updated Dec 4, 2023
- Projects
- 1
- 1 filings
- Latest filing
- Dec 4, 2023
- since Dec 4, 2023
- Largest scope
- —
- Listed value
- —
Where this project stands
Permit expiredExpress: replace decking and asphalt shingles (not going past decking)
- AppliedDec 4, 2023
- IssuedDec 4, 2023
- !WorkDec '23 – Jun '24
- Final inspection
Marked expired Jun 2, 2024.
2 contacts on this project · 2 phone numbers
Permit & project history
1 projectExpress: replace decking and asphalt shingles (not going past decking)
Express: replace decking and asphalt shingles (not going past decking)
City of Austin permitBuilding PermitExpired- Record
- 2023-154797 BP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2001 Teakwood Dr
What is being built at 2001 Teakwood Dr?
The latest filing (City of Austin permit 2023-154797 BP, December 4, 2023) covers express: replace decking and asphalt shingles (not going past decking).
How many permits and filings does 2001 Teakwood Dr have?
1 filing across 1 project, from December 4, 2023 to December 4, 2023.
Is there other construction near 2001 Teakwood Dr?
Yes. Nearby filings include 1913 Teakwood Dr (service upgrade, Aug 7, 2024); 2002 Wooten Dr (express: kitchen remodel replacing cabinetry fixtures flooring and updates to lighting. no walls to be removed and plumbing to remain in same locations, May 13, 2026); 2004 Wooten Dr (pool and spa, Jan 27, 2026).
How do I get alerts for new permits at 2001 Teakwood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 1913 Teakwood DrAug 7, 2024Service upgrade · 20 m away
- 2002 Wooten DrMay 13, 2026Express: kitchen remodel replacing cabinetry fixtures flooring and updates to lighting. no walls to be removed and plumbing to remain in same locations · 39 m away
- 2004 Wooten DrJan 27, 2026Pool and spa · 45 m away
- 2007 Teakwood DrApr 16, 2025Need to replace sewer main in front yard from house to sewer tap · 67 m away
- 2004 Teakwood DrNov 18, 2026Legalization of previously completed unpermitted residential remodel scope includes obtaining after-the-fact permits for existing work code compliance review inspections and any required corrective work to satisfy city of austin permitting requirements · 68 m away
- 2008 Wooten DrMay 27, 2025Repair broken sanitary sewer line under house · 73 m away
- 1910 Wooten DrJun 16, 2025Tunnel and replace all underfloor cast iron with new pvc. replace the sewer yard line. the tunnel is about 8 into the building toward the toilet with 2-3 side tunnels to the shower bathtub and lavatories. at the kitchen sink we will cut about a 15 x 15 section out of the sink cabinet and drywall to run the new drain line outside. at the washer we will cut about a 4x4 section of drywall to add a new washer box and run that through the outside wall. the new sewer yard line will run around the right side of the house across the front yard and driveway down to the existing city sewer connection at the easement. the kitchen/washer line will run around the left side of the house and connect to the front section of the sewer yard line. we are running about 14 of pipe underfloor 6 in the 2 walls and 200 outside regardless of what pipe existed · 77 m away
- 8103 Shadowood DrApr 17, 2025Replacement of complete existing central heat and air system with or without duct work · 86 m away
- 2101 Teakwood DrNov 15, 2023Replacement of 50 feet of sewer line in the front yard · 89 m away
- 1908 Wooten DrMar 26, 2026Replacement of complete existing central heat and air system with or without duct work · 96 m away
- 8105 Shadowood DrMay 7, 2024Express: foundation repair · 105 m away
- 1913 Wooten DrFeb 23, 2026Replace all underfloor cast iron waste and vent piping with new pvc schedule 40 pipe and dwv fittings. we will tunnel to access the piping. approximately 6o of tunneling · 105 m away