2004 Wooten Dr
Austin, TX 78757
Pool and spa plumbing permit at 2004 Wooten Dr
A City of Austin plumbing permit covers pool and spa work at 2004 Wooten Dr. The permit was filed on January 27, 2026, and its status is listed as final.
Summarized from City of Austin records · updated Jan 27, 2026
- Projects
- 2
- 2 filings
- Latest filing
- Jan 27, 2026
- since Jan 27, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledPool and spa
- AppliedSep 13, 2021
- IssuedJan 27, 2026
- WorkJan '26 – Feb '26
- Final inspectionFeb 12, 2026
Passed final inspection Feb 12, 2026.
1 contact on this project · 1 phone number
Permit & project history
2 projectsPool and spa
Pool and spa
City of Austin permitPlumbing PermitFinal- Record
- 2021-199727 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Pool and spa
Pool and spa
City of Austin permitElectrical PermitExpired- Record
- 2021-199727 EP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2004 Wooten Dr
What is happening at 2004 Wooten Dr in Austin?
A City of Austin plumbing permit describes pool and spa work at the address. It was filed January 27, 2026, and is listed as final.
Is a pool being built at 2004 Wooten Dr?
The permit description says “Pool and spa,” but the record does not specify whether this is new construction or work on an existing pool or spa.
When was the pool and spa permit filed at 2004 Wooten Dr?
The City of Austin permit was filed January 27, 2026.
What is the permit number for 2004 Wooten Dr?
The permit number is 2021-199727 PP. It is a plumbing permit for pool and spa work.
Is the permit for 2004 Wooten Dr final?
Yes. The City of Austin record lists permit 2021-199727 PP as final.
Also being built nearby
All of 78757- 2002 Wooten DrMay 13, 2026Express: kitchen remodel replacing cabinetry fixtures flooring and updates to lighting. no walls to be removed and plumbing to remain in same locations · 21 m away
- 2008 Wooten DrMay 27, 2025Repair broken sanitary sewer line under house · 43 m away
- 2001 Teakwood DrDec 4, 2023Express: replace decking and asphalt shingles (not going past decking) · 45 m away
- 1913 Teakwood DrAug 7, 2024Service upgrade · 58 m away
- 2007 Teakwood DrApr 16, 2025Need to replace sewer main in front yard from house to sewer tap · 63 m away
- 2101 Teakwood DrNov 15, 2023Replacement of 50 feet of sewer line in the front yard · 79 m away
- 2010 Pompton DrJun 10, 2025Tunnel under the house and follow the main line 25 until the main drain line transitions from cast iron to pvc and expose the hall bathroom drains. excavation crew would then come back to the kitchen sink tie in and follow the kitchen sink drain line 15 exposing the kitchen sink drain · 86 m away
- 2012 Pompton DrFeb 24, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc · 86 m away
- 1910 Wooten DrJun 16, 2025Tunnel and replace all underfloor cast iron with new pvc. replace the sewer yard line. the tunnel is about 8 into the building toward the toilet with 2-3 side tunnels to the shower bathtub and lavatories. at the kitchen sink we will cut about a 15 x 15 section out of the sink cabinet and drywall to run the new drain line outside. at the washer we will cut about a 4x4 section of drywall to add a new washer box and run that through the outside wall. the new sewer yard line will run around the right side of the house across the front yard and driveway down to the existing city sewer connection at the easement. the kitchen/washer line will run around the left side of the house and connect to the front section of the sewer yard line. we are running about 14 of pipe underfloor 6 in the 2 walls and 200 outside regardless of what pipe existed · 91 m away
- 2004 Teakwood DrNov 18, 2026Legalization of previously completed unpermitted residential remodel scope includes obtaining after-the-fact permits for existing work code compliance review inspections and any required corrective work to satisfy city of austin permitting requirements · 95 m away
- 1913 Wooten DrFeb 23, 2026Replace all underfloor cast iron waste and vent piping with new pvc schedule 40 pipe and dwv fittings. we will tunnel to access the piping. approximately 6o of tunneling · 100 m away
- 1908 Wooten DrMar 26, 2026Replacement of complete existing central heat and air system with or without duct work · 113 m away