Drain line repair permitted at 2606 Pinewood Ter
A plumbing permit covers excavation of a tunnel beneath the house to repair the main drain line. The City of Austin filed permit 2026-085539 PP on July 9, 2026; its status is Final.
Summarized from City of Austin records · updated Jul 9, 2026
- Projects
- 1
- 1 filings
- Latest filing
- Jul 9, 2026
- since Jul 9, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledExcavate 79 tunnel to repair main drain line under the house
- AppliedJul 3, 2026
- IssuedJul 9, 2026
- WorkJul '26 – Oct '26
- Final inspectionOct 8, 2026
Passed final inspection Oct 8, 2026.
1 contact on this project · 1 phone number
Permit & project history
1 projectExcavate 79 tunnel to repair main drain line under the house
Excavate 79 tunnel to repair main drain line under the house
City of Austin permitPlumbing PermitFinal- Record
- 2026-085539 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2606 Pinewood Ter
What work is planned at 2606 Pinewood Ter?
A City of Austin plumbing permit describes excavating a tunnel beneath the house to repair the main drain line.
When was the drain line repair permitted?
The City of Austin filed permit 2026-085539 PP on July 9, 2026.
What is the permit number for work at 2606 Pinewood Ter?
The permit number is 2026-085539 PP. The City of Austin lists its status as Final.
Is a new house being built at 2606 Pinewood Ter?
The permit record describes tunnel excavation to repair the main drain line under the house, not new house construction.
What kind of permit was issued for 2606 Pinewood Ter?
The record is a City of Austin plumbing permit for repair of the main drain line beneath the house.
Also being built nearby
All of 78757- 2607 Cascade DrJul 10, 2025To tunnel 90ft under the foundation to replace the cast-iron drain lines at the kitchen the laundry and the bathroom and install pvc. there will be access holes in the kitchen and bathroom providing access to the exterior area. no work will be done inside the house. no sheetrock removal · 41 m away
- 2607 Pinewood TerMay 1, 2026Express: replacing 5 windows (like for like) · 45 m away
- 2609 Cascade DrAug 28, 2026Base: installing a backup battery system and additional meter socket · 52 m away
- 2611 Cascade DrJun 5, 2025New detached garage · 62 m away
- 2600 Pinewood TerApr 10, 202420ft tunnel under the home for sewer line repair. replacing the drain system from the toilet replace existing damaged drain system piping (roughly 20ft) with pvc · 70 m away
- 2701 Cascade DrOct 30, 2026Replacement of complete existing central heat and air system with or without duct work lennox 1.5 ton merit (up-flow) gas 80% · 80 m away
- 2606 Cascade DrAug 30, 2026Install new gas line for generator · 89 m away
- 2608 Cascade DrApr 15, 2026Tunnel under the foundation to replace the cast iron in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holds in front back and the side of the house · 93 m away
- 2508 Pinewood TerAug 14, 2026Replace two garage doors with a single door replace exposed beam with a new beam above ceiling. add outlet for garage door opener. garage has not been converted into conditioned living space is not habitable square footage · 95 m away
- 2610 Greenlawn PkwyOct 17, 2025Replacement of complete existing central heat and air system with or without duct work · 98 m away
- 2602 Cascade DrApr 13, 2026Request to disconnect install 150 amp ats and 26kw generator · 100 m away
- 2509 Cascade DrJun 2, 2025Emergency (storm damage) - service replacement · 105 m away