groundranger
Active · latest filing Oct 2026Residential

2701 Cascade Dr

Austin, TX 78757

Home permits cover a tub-to-shower conversion and HVAC replacement

Permits at 2701 Cascade Dr cover a tub-to-shower conversion in the existing footprint, permitted October 27, 2025, and replacement of the central heating and air system, permitted October 30, 2026. The records describe home improvements, not new construction.

Summarized from City of Austin records · updated Oct 30, 2026

Projects
3
3 filings
Latest filing
Oct 30, 2026
since Oct 27, 2025
Largest scope
—
Listed value
—

Permit & project history

3 projects
  1. Replacement of complete existing central heat and air system with or without duct work lennox 1.5 ton merit (up-flow) gas 80%

    Replacement of complete existing central heat and air system with or without duct work lennox 1.5 ton merit (up-flow) gas 80%

    City of Austin permitMechanical PermitActive
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  2. Express - tub to shower replacement in the same footprint and not moving plumbing

    Express - tub to shower replacement in the same footprint and not moving plumbing

    City of Austin permitBuilding PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro
  3. Express - tub to shower replacement in the same footprint and not moving plumbing

    Express - tub to shower replacement in the same footprint and not moving plumbing

    City of Austin permitPlumbing PermitFinal
    Owner
    Pro
    Contractor
    Pro
    Contact
    Pro

Sources: City of Austin

Questions about 2701 Cascade Dr

What work is being done at 2701 Cascade Dr?

Austin permits describe a tub-to-shower conversion without moving plumbing and replacement of the home's central heating and air system.

Is a new home being built at 2701 Cascade Dr?

The records list home improvements rather than a new home: a tub-to-shower conversion and replacement of the central heating and air system.

When was the tub-to-shower permit filed at 2701 Cascade Dr?

The building and plumbing permits, 2025-137171 BP and 2025-137171 PP, were filed October 27, 2025. Both are marked final.

What HVAC work was permitted at 2701 Cascade Dr?

Permit 2026-132255 MP covers replacement of the complete existing central heat and air system, with or without duct work. It was filed October 30, 2026 and is marked active.

Is the bathroom plumbing being moved at 2701 Cascade Dr?

No. The permit description says the tub-to-shower replacement is in the same footprint and does not move plumbing.

Also being built nearby

All of 78757
Get alerts for 2701 Cascade Dr