Site plan review filed for Busy B Batting Cages
A site plan for Busy B Batting Cages is under review at 2627 Buell Ave. The City of Austin case was filed November 13, 2026. Earlier permits, finalized in June 2025, covered demolition of a 3,000-square-foot metal structure and its concrete pad.
Summarized from City of Austin records · updated Nov 18, 2026
- Projects
- 3
- 3 filings
- Latest filing
- Nov 18, 2026
- since Nov 18, 2026
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledWater & wastewater cap - total demolition of 3000sf metal structure concrete pad circa 1972
- AppliedJun 12, 2025
- IssuedJun 24, 2025
- WorkJun '25 – Jul '25
- Final inspectionJul 1, 2025
Passed final inspection Jul 1, 2025.
1 contact on this project · 1 phone number
Permit & project history
3 projectsWater & wastewater cap - total demolition of 3000sf metal structure concrete pad circa 1972
Water & wastewater cap - total demolition of 3000sf metal structure concrete pad circa 1972
City of Austin permitPlumbing PermitFinal- Record
- 2025-075325 PP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Total demolition of 3000sf metal structure concrete pad circa 1972
Total demolition of 3000sf metal structure concrete pad circa 1972
City of Austin permitBuilding PermitFinal- Record
- 2025-075161 BP
- Tenant / owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 2627 Buell Ave
What is being built at 2627 Buell Ave in Austin?
A City of Austin site plan case named Busy B Batting Cages is under review at the address. The filing does not establish that construction is underway.
Are batting cages planned for 2627 Buell Ave?
The site plan case is named Busy B Batting Cages and was filed November 13, 2026. Its status is In Review.
Has the existing building at 2627 Buell Ave been demolished?
City of Austin building permit 2025-075161 BP covers total demolition of a 3,000-square-foot metal structure and concrete pad. The permit was finalized June 18, 2025.
When was demolition permitted at 2627 Buell Ave?
The building demolition permit, 2025-075161 BP, was filed June 18, 2025, and finalized. A related water and wastewater cap permit, 2025-075325 PP, was filed June 24, 2025, and also finalized.
What is the status of the Busy B Batting Cages project in Austin?
The City of Austin site plan case 13746469 was filed November 13, 2026, and is listed as In Review.
Also being built nearby
All of 78757- 8207 Stillwood LnNov 22, 2023Construct new driveway approach of 20 ft. *rs · 36 m away
- 8205 Stillwood LnNov 10, 2025Replacement of an existing water heater · 48 m away
- 8210-1/2 Stillwood LnAug 26, 20268440 burnet rd offsite ww · 74 m away
- 8200 Valleydale CvDec 11, 2025Replacement of complete existing central heat and air system with or without duct work · 79 m away
- 8206 Stillwood LnMar 23, 2026Gas test on house for a locked meter repairs are complete · 81 m away
- 8303 Stillwood LnOct 9, 2026Relocate meter/service equipment from rear of home to garage side. install new 200a meter base service mast exterior 125a disconnect grounding/bonding and surge protection. install up to 20 of 2/0 aluminum ser from new disconnect to existing garage panel location. replace existing garage main panel with new 125a 24-space subpanel · 84 m away
- 8204 Stillwood LnJun 8, 2026Updating electrical service ilo ragloop · 86 m away
- 2605 Buell AveMar 2, 2007Acratod of austin, inc · 90 m away
- 8209 Briarwood LnJun 2, 2026Tunnel for a sewer line replacement. 15 tunnel (main trunk line kitchen toilet vanity & shower) · 122 m away
- 8207 Briarwood LnDec 4, 2025Replacement of complete existing central heat and air system with or without duct work · 122 m away
- 8205 Briarwood LnFeb 20, 2024Replacement of complete existing central heat and air system with or without duct work · 128 m away
- 2701 Steck AveAug 11, 2025A whole house sewer re-pipe. tunnel and yard line · 134 m away