3007 Greenlawn Pkwy
Austin, TX 78757
3007 Greenlawn Pkwy: 1 project on record
City of Austin lists 1 filing across 1 project at 3007 Greenlawn Pkwy, Austin, TX 78757. The most recent, filed July 2, 2025, covers: “Construct new driveway approach of 18 ft”.
Compiled from City of Austin records · updated Jul 2, 2025
- Projects
- 1
- 1 filings
- Latest filing
- Jul 2, 2025
- since Jul 2, 2025
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledConstruct new driveway approach of 18 ft
- AppliedMay 30, 2025
- IssuedJul 2, 2025
- WorkJul '25 – Jul '25
- Final inspectionJul 18, 2025
Passed final inspection Jul 18, 2025.
Permit & project history
1 projectConstruct new driveway approach of 18 ft
Construct new driveway approach of 18 ft
City of Austin permitDriveway / SidewalksFinal- Record
- 2025-067212 DS
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3007 Greenlawn Pkwy
What is being built at 3007 Greenlawn Pkwy?
The latest filing (City of Austin permit 2025-067212 DS, July 2, 2025) covers construct new driveway approach of 18 ft.
How many permits and filings does 3007 Greenlawn Pkwy have?
1 filing across 1 project, from July 2, 2025 to July 2, 2025.
Is there other construction near 3007 Greenlawn Pkwy?
Yes. Nearby filings include 3005 Greenlawn Pkwy (addition to existing 1-story single-family residential to include: covered patio/outdoor kitchen; new golf simulator room/ accessory structure with full bath, Oct 19, 2026); 3004 Greenlawn Pkwy (new pool (autofill/heated), Oct 20, 2026); 3102 Greenlawn Pkwy (25 ft tunnel to repair sewer line. access in front property in yard, Sep 19, 2024).
How do I get alerts for new permits at 3007 Greenlawn Pkwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 3005 Greenlawn PkwyOct 19, 2026Addition to existing 1-story single-family residential to include: covered patio/outdoor kitchen; new golf simulator room/ accessory structure with full bath · 24 m away
- 3004 Greenlawn PkwyOct 20, 2026New pool (autofill/heated) · 65 m away
- 3102 Greenlawn PkwySep 19, 202425 ft tunnel to repair sewer line. access in front property in yard · 65 m away
- 3105 Greenlawn PkwyAug 14, 2026150-amp overhead service rebuild · 74 m away
- 3104 Pinecrest DrJan 19, 2026Install a full lawn sprinkler system · 74 m away
- 3001 Greenlawn PkwyAug 11, 2026Tunnel under the foundation to replace the cast iron drain lines in the bathroom kitchen and laundry with sch 40 pvc. there will be three access holes: one in front one on the side and one behind the house · 75 m away
- 3009 Pinecrest DrFeb 24, 2026Excavate 10 tunnel to repair main drain line under house · 92 m away
- 3106 Greenlawn PkwyAug 25, 2026Base: installing a backup battery system and additional meter socket · 98 m away
- 3103 Stardust DrDec 24, 2024Expedited review: new pool · 102 m away
- 3005 Stardust DrMar 5, 2024Replacement of an existing water heater · 104 m away
- 2908 Pinecrest DrSep 21, 2026Replacement of complete existing central heat and air system with or without duct work hvac change out · 120 m away
- 2907 Greenlawn PkwyOct 17, 2024Irrigation system · 121 m away