3102 Greenlawn Pkwy
Austin, TX 78757
3102 Greenlawn Pkwy: 1 project on record
City of Austin lists 1 filing across 1 project at 3102 Greenlawn Pkwy, Austin, TX 78757. The most recent, filed September 19, 2024, covers: “25 ft tunnel to repair sewer line. access in front property in yard”.
Compiled from City of Austin records · updated Sep 19, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Sep 19, 2024
- since Sep 19, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
Finaled25 ft tunnel to repair sewer line. access in front property in yard
- AppliedSep 13, 2024
- IssuedSep 19, 2024
- WorkSep '24 – Oct '24
- Final inspectionOct 11, 2024
Passed final inspection Oct 11, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 project25 ft tunnel to repair sewer line. access in front property in yard
25 ft tunnel to repair sewer line. access in front property in yard
City of Austin permitPlumbing PermitFinal- Record
- 2024-124805 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3102 Greenlawn Pkwy
What is being built at 3102 Greenlawn Pkwy?
The latest filing (City of Austin permit 2024-124805 PP, September 19, 2024) covers 25 ft tunnel to repair sewer line. access in front property in yard.
How many permits and filings does 3102 Greenlawn Pkwy have?
1 filing across 1 project, from September 19, 2024 to September 19, 2024.
Is there other construction near 3102 Greenlawn Pkwy?
Yes. Nearby filings include 3103 Stardust Dr (expedited review: new pool, Dec 24, 2024); 3106 Greenlawn Pkwy (base: installing a backup battery system and additional meter socket, Aug 25, 2026); 3105 Greenlawn Pkwy (150-amp overhead service rebuild, Aug 14, 2026).
How do I get alerts for new permits at 3102 Greenlawn Pkwy?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 3103 Stardust DrDec 24, 2024Expedited review: new pool · 41 m away
- 3106 Greenlawn PkwyAug 25, 2026Base: installing a backup battery system and additional meter socket · 45 m away
- 3105 Greenlawn PkwyAug 14, 2026150-amp overhead service rebuild · 64 m away
- 3007 Greenlawn PkwyJul 2, 2025Construct new driveway approach of 18 ft · 65 m away
- 3107 Stardust DrFeb 9, 2024Total demolition of sfr 1905 sq ft circa 1961 · 67 m away
- 3004 Greenlawn PkwyOct 20, 2026New pool (autofill/heated) · 76 m away
- 3005 Greenlawn PkwyOct 19, 2026Addition to existing 1-story single-family residential to include: covered patio/outdoor kitchen; new golf simulator room/ accessory structure with full bath · 80 m away
- 3005 Stardust DrMar 5, 2024Replacement of an existing water heater · 86 m away
- 3100 Stardust DrDec 3, 2024Tunnel from exterior of home and under foundation to replace cast iron drain system up to bottom of foundation with new schedule 40 pvc · 91 m away
- 3104 Stardust DrNov 19, 2024Replace 200 amp main panel with 200 amp smart panel - whole home energy management system (span) · 95 m away
- 3201 Greenlawn PkwyJan 29, 2024New inground pool and spa with reqd enclosure device for existing 1-story sfr · 101 m away
- 3104 Pinecrest DrJan 19, 2026Install a full lawn sprinkler system · 102 m away