3010 Firwood Dr
Austin, TX 78757
3010 Firwood Dr: 1 project on record
City of Austin lists 1 filing across 1 project at 3010 Firwood Dr, Austin, TX 78757. The most recent, filed February 14, 2024, covers: “Replacement of an existing ng water heater”.
Compiled from City of Austin records · updated Feb 14, 2024
- Projects
- 1
- 1 filings
- Latest filing
- Feb 14, 2024
- since Feb 14, 2024
- Largest scope
- —
- Listed value
- —
Where this project stands
FinaledReplacement of an existing ng water heater
- AppliedFeb 9, 2024
- IssuedFeb 14, 2024
- WorkFeb '24 – Mar '24
- Final inspectionMar 22, 2024
Passed final inspection Mar 22, 2024.
1 contact on this project · 1 phone number
Permit & project history
1 projectReplacement of an existing ng water heater
Replacement of an existing ng water heater
City of Austin permitPlumbing PermitFinal- Record
- 2024-016872 PP
- Owner
- Pro
- Contractor
- Pro
- Contact
- Pro
Sources: City of Austin
Questions about 3010 Firwood Dr
What is being built at 3010 Firwood Dr?
The latest filing (City of Austin permit 2024-016872 PP, February 14, 2024) covers replacement of an existing ng water heater.
How many permits and filings does 3010 Firwood Dr have?
1 filing across 1 project, from February 14, 2024 to February 14, 2024.
Is there other construction near 3010 Firwood Dr?
Yes. Nearby filings include 3101 Steck Ave (express - demolition kitchen remodel bathroom remodel doors and windows size for size replacement replace flooring paint interior and exterior, Apr 24, 2025); 3009 Steck Ave (repair existing sewer line only, Dec 18, 2025); 8106 Vinewood Ln (60 tunnel below the foundation to replace entire cast iron drain system. 3 access holes - front right back, Apr 1, 2025).
How do I get alerts for new permits at 3010 Firwood Dr?
Watch this address on groundranger and you'll get an email when a new permit or project filing appears here or nearby.
Also being built nearby
All of 78757- 3101 Steck AveApr 24, 2025Express - demolition kitchen remodel bathroom remodel doors and windows size for size replacement replace flooring paint interior and exterior · 36 m away
- 3009 Steck AveDec 18, 2025Repair existing sewer line only · 40 m away
- 8106 Vinewood LnApr 1, 202560 tunnel below the foundation to replace entire cast iron drain system. 3 access holes - front right back · 43 m away
- 3103 Steck AveJan 7, 2025Trenching 42 lf and tunneling 42lf to correct wastewater line breaks and areas holding water as indicated on the drawing · 44 m away
- 3009 Firwood DrJun 18, 2025Request to disconnect: install automatic transfer switch next to existing overhead 200 amp meter can. meter can to remain. run conduit/wire form automatic transfer switch to existing panel. run wire out of automatic transfer switch to generator · 49 m away
- 3005 Steck AveJun 8, 2026Gas pressure test and code upgrades · 69 m away
- 3004 Vinewood CvNov 16, 2026Replacement of an existing water heater replace 40-gallon gas water heater location: interior closet · 85 m away
- 8100 Vinewood LnFeb 27, 2024Replacement of an existing water heater · 92 m away
- 8202 Sandalwood CvJul 2, 2024Replacement of 10ft of gas line · 101 m away
- 8203 Sandalwood CvMar 8, 2024Construct new driveway approach of 16 ft · 115 m away
- 8204 Sandalwood CvFeb 5, 2024Sewer yard line repair · 121 m away
- 8102 Rockwood LnJan 26, 2026125 amp mb outdoor panel - siemans economy series and 125 amp overhead riser thru roof. riser is not being moved. it is an upgrade rigid pipe through the roof · 124 m away